Skip to Content.
Sympa Menu

star-fst-l - Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time)

star-fst-l AT lists.bnl.gov

Subject: Star-fst-l mailing list

List archive

Chronological Thread  
  • From: Yi Yang <yiyang AT ncku.edu.tw>
  • To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
  • Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
  • Subject: Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time)
  • Date: Mon, 20 Apr 2020 21:54:00 +0800

Hi All,

Please find the design drawings of the fixtures for the plan A assembly procedure  in the following link:

Cheers,
Yi



+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++


On Sun, Apr 19, 2020 at 1:26 AM Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
Dear all,

We will have the Weekly FST meeting on Monday starting at 9am EST (BNL local time).

Bluejeans Meeting URL https://bluejeans.com/101020434
Meeting ID: 101 020 434

https://drupal.star.bnl.gov/STAR/event/2020/04/20/fst-group-meeting

Tentative meeting agenda:

0. follow-ups on the action items from last week (see *** below)
1. Integration                                                                 by Rahul Sharma, John Scheblein
2. Mechanical structure                                                  by Yi Yang, Han-Sheng Li
3. Prototype Module Assembly and Test                        by Xu Sun
4. Tracking Studies                                                         by Krishan Gopal, Daniel Brandenburg

*** Action items from previous weeks ***
1) Provide a detailed document of the procedure and requirements of gluing hybrids onto MS - Yi/Han-Sheng
2) SDU measure hybrid flatness and dimensions - Jianing/Maowu
3) New hybrid design for mounting hybrids - Yi/Jianing/Yi
4) Send Rahul the weights of the disks - Yi
5) Order more connectors for hybrids - Yi
6) UIC send a T-board and cable to NCKU to check if there is any conflict with the MS - Zhenyu
7) Studying the tracking performance by varying the Z-locations of FST disks, and number of r/phi segments - Krishan/Daniel

Best,
Zhenyu
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l



Archive powered by MHonArc 2.6.24.

Top of Page