- From: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- To: "Ye, Zhenyu" <yezhenyu AT uic.edu>
- Cc: "star-fst-l AT lists.bnl.gov" <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time)
- Date: Sat, 25 Apr 2020 00:08:21 +0000
************************************************************
Mechanical structures - Yi
************************************************************
-> expect to deliver two MS to UIC in the 1st week of May
Should be 1st week of June
> On Apr 24, 2020, at 7:05 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Attendees: Daniel, Han-Sheng, Jianing, John, Krishan, Maowu, Mike, Rahul,
> Te-Chuan, Xu, Yi, Yu, Zhenyu
>
> ************************************************************
> Follow-up on action items from previous work
> ************************************************************
> 1) Provide a detailed document of the procedure and requirements of gluing
> hybrids onto MS - Yi/Han-Sheng
> -> can only write down the concept at the moment, can not write down the
> step-by-step procedure w/o practicing
>
> 2) SDU measure hybrid flatness and dimensions - Jianing/Maowu
> -> See presentation today
>
> 3) New hybrid design for mounting hybrid Plan B - Jianing/Maowu/Yi
> -> See presentation today
>
> 4) Send Rahul the weights of the disks - Yi
> -> Will send Rahul and John densities of the materials so that they can put
> in the model (done)
>
> 5) Order more connectors for hybrids - Yi
> -> have sent the request to sales of agenda for ordering 20 connectors.
> Will follow up tomorrow
>
> 6) UIC send a T-board and cable to NCKU to check if there is any conflict
> with the MS - Zhenyu
> -> will do when campus is reopen
>
> 7) Studying the tracking performance by varying the Z-locations of FST
> disks, and number of r/phi segments - Krishan/Daniel
> -> Daniel will give a presentation tomorrow on Z-locations tomorrow
> -> Krishan is studying charge-identification and momentum resolution for
> varying 20 um and 1mm PV resolution,
>
> ************************************************************
> Integration - Rahul
> ************************************************************
> -> no major update, but will update the model after studies from Daniel on
> Z-locations
> -> new designer started working today
>
> ************************************************************
> Mechanical structures - Yi
> ************************************************************
> -> expect to deliver two MS to UIC in the 1st week of May
> -> new assistant will start working at NTU this week for 1-2 weeks, will
> get familiar with Labview program to control the machine, study hybrid
> injection pattern with plastic films
> -> has a contact in place with a company to measure the surface flatness
> and being parallel between inner-outer sectors, before and after glueing
> hybrids and inner-outer together. The company is design jig for the
> measurements. They will use optical gauge machine, but also mechanical
> gauge machine.The number of measurement points are under discussion now.
> Will provide document and share the info with the group
>
> ************************************************************
> Hybrid
> ************************************************************
> -> Will contact the company to find out how they will fix the hybrid and
> measure its flatness and thickness. May send some hybrids to the company so
> that they can give such info.
> -> The company will also measure the relative positions of APV pads w.r.t.
> reference vias
>
> -> Modified hybrid design by adding extra structures with holes for Plan B
> of gluing hybrids onto MS
> -> After approval by the group will take 4 weeks for production
> -> need to hear Plan B from Yi before moving forward
>
>
> ************************************************************
> Action items
> ************************************************************
> 1) Document the procedure and requirements of gluing hybrids onto MS for
> Plan A at NTU - Yi/Han-Sheng
> 2) Document the procedure and requirements of gluing hybrids onto MS for
> Plan B by AIDC. This is needed before new hybrid production - Yi/Han-Sheng
> 3) Document on how/where the company would measure the surface flatness and
> being parallel between inner-outer sectors, before and after glueing
> hybrids and inner-outer sectors together - Yi/Han-Sheng
> 4) Find out how the company would fix the hybrid and measure its flatness
> and thickness - Jianing/Maowu
> 5) UIC send a T-board and cable to NCKU to check if there is any conflict
> with the MS - Zhenyu
> 6) Studying the tracking performance by varying the Z-locations of FST
> disks, and number of r/phi segments - Krishan/Daniel
>
>> On Apr 18, 2020, at 12:26 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> Dear all,
>>
>> We will have the Weekly FST meeting on Monday starting at 9am EST (BNL
>> local time).
>>
>> Bluejeans Meeting URL https://bluejeans.com/101020434
>> Meeting ID: 101 020 434
>>
>> https://drupal.star.bnl.gov/STAR/event/2020/04/20/fst-group-meeting
>>
>> Tentative meeting agenda:
>>
>> 0. follow-ups on the action items from last week (see *** below)
>> 1. Integration
>> by Rahul Sharma, John Scheblein
>> 2. Mechanical structure
>> by Yi Yang, Han-Sheng Li
>> 3. Prototype Module Assembly and Test by Xu Sun
>> 4. Tracking Studies
>> by Krishan Gopal, Daniel Brandenburg
>>
>> *** Action items from previous weeks ***
>> 1) Provide a detailed document of the procedure and requirements of gluing
>> hybrids onto MS - Yi/Han-Sheng
>> 2) SDU measure hybrid flatness and dimensions - Jianing/Maowu
>> 3) New hybrid design for mounting hybrids - Yi/Jianing/Yi
>> 4) Send Rahul the weights of the disks - Yi
>> 5) Order more connectors for hybrids - Yi
>> 6) UIC send a T-board and cable to NCKU to check if there is any conflict
>> with the MS - Zhenyu
>> 7) Studying the tracking performance by varying the Z-locations of FST
>> disks, and number of r/phi segments - Krishan/Daniel
>>
>> Best,
>> Zhenyu
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
-
[Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/18/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
videbaek, 04/18/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/18/2020
- Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time), Aschenauer Elke-Caroline, 04/19/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/18/2020
- Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time), Yi Yang, 04/20/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/24/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/24/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/27/2020
- Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time), Ye, Zhenyu, 04/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/27/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
Ye, Zhenyu, 04/24/2020
-
Re: [Star-fst-l] Weekly FST meeting, April 20 9am (BNL time),
videbaek, 04/18/2020
Archive powered by MHonArc 2.6.24.