Action items
************************************************************
1) Document the procedure and requirements of gluing hybrids onto MS for Plan
A at NTU - Yi/Han-Sheng
2) Document the procedure and requirements of gluing hybrids onto MS for Plan
B by AIDC. This is needed before new hybrid production - Yi/Han-Sheng
3) Document on how/where the company would measure the surface flatness and
being parallel between inner-outer sectors, before and after glueing hybrids
and inner-outer sectors together - Yi/Han-Sheng
4) Look into checking radiation tolerance of cooling soft tubes in
STAR/Taiwan - Flemming/Yi
4) Find out how the company would fix the hybrid and measure its flatness and
thickness - Maowu/Jianing
5) UIC send a T-board and cable to NCKU to check if there is any conflict
with the MS - Zhenyu
6) Adding Felix to FST mailing list - Rahul/Zhenyu
7) Looking into alternative clustering algorithm to improve matching
efficiency - Xu
8) Studying the tracking performance by varying the Z-locations of FST disks,
and number of r/phi segments - Krishan/Daniel
9) Looking into FST simulation with Te-Chuan’s code/instruction - Shenghui

> On Apr 27, 2020, at 9:28 AM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>
> Minutes
>
> ************************************************************
> Action items
> ************************************************************
> 1) Document the procedure and requirements of gluing hybrids onto MS for
> Plan A at NTU - Yi
> -> RA visited NTU last Friday and stay for about 5 weeks to establish the
> procedure and work on prototype assembly. Expect to be ready for operations
> in 3 weeks (end of first week or middle of the second week in May)
> -> Fixture and jigs will be finished this week, Han-sehng will take them to
> NTU, will provide detailed procedure document in 2 weeks
>
> 2) Document the procedure and requirements of gluing hybrids onto MS for
> Plan B by AIDC. This is needed before new hybrid production - Yi
> -> Had a discussion with AIDC 1.5 weeks ago, will provide the drawings for
> jigs/fixtures, and document the procedure
>
> 3) Document on how/where the company would measure the surface flatness and
> being parallel between inner-outer sectors, before and after glueing
> hybrids and inner-outer sectors together - Yi
> -> will provide a document to the company on measurement requirement. Will
> report to the group with the details and quotes
>
> 4) Find out how the company would fix the hybrid and measure its flatness
> and thickness - Maowu
> -> Sent an inner hybrid to company, and requested for details about how
> they would fix the hybrid and measure thickness and flatness
>
> 5) UIC send a T-board and cable to NCKU to check if there is any conflict
> with the MS - Zhenyu
> -> Will do once the university is reopen
>
> 6) Studying the tracking performance by varying the Z-locations of FST
> disks, and number of r/phi segments - Krishan/Daniel
> -> changing FST disk Z-location manually is fine, but problems when using
> xml file for track resconstruction. Looking into it
>
> ************************************************************
> Integration - Rahul
> ************************************************************
> New designer Felix started since last week, resolved a few problems
> (training, computer). Right now waiting for ITD to give him access to STSG
> directory. After that, Felix will take over
> -> Action item: adding Felix to FST mailing list - Rahul/Zhenyu
>
> ************************************************************
> Mechanical structure - Yi
> ************************************************************
> EASTON: new mold will be finished on May 6, and will make 10 or 20 (don’t
> remember the exact number) sets of new structures
> Ordered 10 pieces of connectors. Will take about 4 weeks to deliver
> Finish soft tube testing, will report later.
> Radiation tolerance of soft tube: instead of BNL radiative source, may try
> to put the soft tubes in STAR for tolerance test. Flemming will ask Robert
> about TLDs. Yi will check if there is such facility at Taiwan
>
> ************************************************************
> Prototype module assembly and test - Xu
> ************************************************************
> Looking into clustering algorithm, see if can improve the matching
> efficiency
>
> ************************************************************
> Simulation - Shenghui
> ************************************************************
> Started looking into the Te-Chuan code/document
>
> ************************************************************
> AOB
> ************************************************************
> Yi: what is the status of the cooling system ?
> Rahul: ordered some sealing compound, planned to rebuild the system but
> then the lab closed
>
>> On Apr 24, 2020, at 7:08 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> ************************************************************
>> Mechanical structures - Yi
>> ************************************************************
>> -> expect to deliver two MS to UIC in the 1st week of May
>>
>> Should be 1st week of June
>>
>>> On Apr 24, 2020, at 7:05 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>>
>>> Attendees: Daniel, Han-Sheng, Jianing, John, Krishan, Maowu, Mike, Rahul,
>>> Te-Chuan, Xu, Yi, Yu, Zhenyu
>>>
>>> ************************************************************
>>> Follow-up on action items from previous work
>>> ************************************************************
>>> 1) Provide a detailed document of the procedure and requirements of
>>> gluing hybrids onto MS - Yi/Han-Sheng
>>> -> can only write down the concept at the moment, can not write down the
>>> step-by-step procedure w/o practicing
>>>
>>> 2) SDU measure hybrid flatness and dimensions - Jianing/Maowu
>>> -> See presentation today
>>>
>>> 3) New hybrid design for mounting hybrid Plan B - Jianing/Maowu/Yi
>>> -> See presentation today
>>>
>>> 4) Send Rahul the weights of the disks - Yi
>>> -> Will send Rahul and John densities of the materials so that they can
>>> put in the model (done)
>>>
>>> 5) Order more connectors for hybrids - Yi
>>> -> have sent the request to sales of agenda for ordering 20 connectors.
>>> Will follow up tomorrow
>>>
>>> 6) UIC send a T-board and cable to NCKU to check if there is any conflict
>>> with the MS - Zhenyu
>>> -> will do when campus is reopen
>>>
>>> 7) Studying the tracking performance by varying the Z-locations of FST
>>> disks, and number of r/phi segments - Krishan/Daniel
>>> -> Daniel will give a presentation tomorrow on Z-locations tomorrow
>>> -> Krishan is studying charge-identification and momentum resolution for
>>> varying 20 um and 1mm PV resolution,
>>>
>>> ************************************************************
>>> Integration - Rahul
>>> ************************************************************
>>> -> no major update, but will update the model after studies from Daniel
>>> on Z-locations
>>> -> new designer started working today
>>>
>>> ************************************************************
>>> Mechanical structures - Yi
>>> ************************************************************
>>> -> expect to deliver two MS to UIC in the 1st week of May
>>> -> new assistant will start working at NTU this week for 1-2 weeks, will
>>> get familiar with Labview program to control the machine, study hybrid
>>> injection pattern with plastic films
>>> -> has a contact in place with a company to measure the surface flatness
>>> and being parallel between inner-outer sectors, before and after glueing
>>> hybrids and inner-outer together. The company is design jig for the
>>> measurements. They will use optical gauge machine, but also mechanical
>>> gauge machine.The number of measurement points are under discussion now.
>>> Will provide document and share the info with the group
>>>
>>> ************************************************************
>>> Hybrid
>>> ************************************************************
>>> -> Will contact the company to find out how they will fix the hybrid and
>>> measure its flatness and thickness. May send some hybrids to the company
>>> so that they can give such info.
>>> -> The company will also measure the relative positions of APV pads
>>> w.r.t. reference vias
>>>
>>> -> Modified hybrid design by adding extra structures with holes for Plan
>>> B of gluing hybrids onto MS
>>> -> After approval by the group will take 4 weeks for production
>>> -> need to hear Plan B from Yi before moving forward
>>>
>>>
>>> ************************************************************
>>> Action items
>>> ************************************************************
>>> 1) Document the procedure and requirements of gluing hybrids onto MS for
>>> Plan A at NTU - Yi/Han-Sheng
>>> 2) Document the procedure and requirements of gluing hybrids onto MS for
>>> Plan B by AIDC. This is needed before new hybrid production -
>>> Yi/Han-Sheng
>>> 3) Document on how/where the company would measure the surface flatness
>>> and being parallel between inner-outer sectors, before and after glueing
>>> hybrids and inner-outer sectors together - Yi/Han-Sheng
>>> 4) Find out how the company would fix the hybrid and measure its flatness
>>> and thickness - Jianing/Maowu
>>> 5) UIC send a T-board and cable to NCKU to check if there is any conflict
>>> with the MS - Zhenyu
>>> 6) Studying the tracking performance by varying the Z-locations of FST
>>> disks, and number of r/phi segments - Krishan/Daniel
>>>
>>>> On Apr 18, 2020, at 12:26 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>>>
>>>> Dear all,
>>>>
>>>> We will have the Weekly FST meeting on Monday starting at 9am EST (BNL
>>>> local time).
>>>>
>>>> Bluejeans Meeting URL https://bluejeans.com/101020434
>>>> Meeting ID: 101 020 434
>>>>
>>>> https://drupal.star.bnl.gov/STAR/event/2020/04/20/fst-group-meeting
>>>>
>>>> Tentative meeting agenda:
>>>>
>>>> 0. follow-ups on the action items from last week (see *** below)
>>>> 1. Integration
>>>> by Rahul Sharma, John Scheblein
>>>> 2. Mechanical structure
>>>> by Yi Yang, Han-Sheng Li
>>>> 3. Prototype Module Assembly and Test by Xu Sun
>>>> 4. Tracking Studies
>>>> by Krishan Gopal, Daniel Brandenburg
>>>>
>>>> *** Action items from previous weeks ***
>>>> 1) Provide a detailed document of the procedure and requirements of
>>>> gluing hybrids onto MS - Yi/Han-Sheng
>>>> 2) SDU measure hybrid flatness and dimensions - Jianing/Maowu
>>>> 3) New hybrid design for mounting hybrids - Yi/Jianing/Yi
>>>> 4) Send Rahul the weights of the disks - Yi
>>>> 5) Order more connectors for hybrids - Yi
>>>> 6) UIC send a T-board and cable to NCKU to check if there is any
>>>> conflict with the MS - Zhenyu
>>>> 7) Studying the tracking performance by varying the Z-locations of FST
>>>> disks, and number of r/phi segments - Krishan/Daniel
>>>>
>>>> Best,
>>>> Zhenyu
>>>> _______________________________________________
>>>> Star-fst-l mailing list
>>>> Star-fst-l AT lists.bnl.gov
>>>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>>>
>>
>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l




Archive powered by MHonArc 2.6.24.

Top of Page