Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs
- From: Hal Evans <hgevans AT indiana.edu>
- To: Elliot Lipeles <lipeles AT hep.upenn.edu>
- Cc: Stephanie Majewski <smajewsk AT uoregon.edu>, Mel Shochet <shochet AT hep.uchicago.edu>, Wade Fisher <wfisher.msu AT gmail.com>, Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
- Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs
- Date: Mon, 8 Jul 2019 14:13:05 -0400
Hi Elliot, I think that it would be very useful to get something on the physics impact of the throughput reduction is. HH->4b is a good proxy here. Even if we don't have enough time to get it in the official material for the DR, you can still have the statement available. In the end it's the physics impact that NSF wants to see. Thanks - Hal On 7/8/19 12:00 PM, Elliot Lipeles
wrote:
Hi Hal,
The hard part on the impact is what the effect of a 17% or
33% change in throughput is. Particularly because the
throughput requirements have a margin in it. We could based on
the TDR probably estimate what happens to HH->4b with 17%
or 33% less tracking rate, which would be a proxy for what
would happen to sensitive topics in general. Is a change in
throughput sufficient or should I spend an hour trying to
figure the impact on HH->4b (the only topic where there are
enough studies to actually get a number).
Elliot
On Mon, Jul 8, 2019 at 10:52
AM Hal Evans <hgevans AT indiana.edu> wrote:
Thanks Elliot! So - just to confirm - on the scope contingency/opportunity side, the costs and/or decision dates have not changed? Also: do you have any improvements to the impact statements to suggest? Cheers - Hal On
7/8/19 10:15 AM, Elliot Lipeles wrote:
-- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ -- ^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v Hal Evans hgevans AT indiana.edu http://pages.iu.edu/~hgevans/ Tel: (812)856-3828 Fax: (812)855-5533 253 Swain Hall West Indiana University 727 E. Third St. Bloomington, IN 47405 v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^v^ |
-
[Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Hal Evans, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Elliot Lipeles, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Hal Evans, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Elliot Lipeles, 07/08/2019
- Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs, Hal Evans, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Elliot Lipeles, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Hal Evans, 07/08/2019
-
Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] QA/QC, Tech Specs, and Scope docs,
Elliot Lipeles, 07/08/2019
Archive powered by MHonArc 2.6.24.