Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets
- From: John Parsons <parsons AT nevis.columbia.edu>
- To: "Ma, Hong" <hma AT bnl.gov>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets
- Date: Sun, 31 Mar 2019 13:42:58 -0400
Yes, I think that is fine.
On 3/31/19 1:16 PM, Ma, Hong wrote:
You are right that we should declare the downselect is completed.
I can’t find an official date for the decision (reading through PL’s reports to Group Reps). Maybe it is in the LAr SG minutes, or Phase-II SG minutes. In any case, I assume it is settled in the Oct LAr week, hence 10/5/2018.
Hong.
*From: *John Parsons <parsons AT nevis.columbia.edu>
*Date: *Sunday, March 31, 2019 at 12:39 PM
*To: *"Ma, Hong" <hma AT bnl.gov>, "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
*Subject: *Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets
Thanks Hong. A reminder to all other L3 to complete this
before Tues. Make sure also to check the previous 100% tasks
on the list; hopefully they are all correct, in which case
for those you should just copy 100% into the "current % complete"
column. Let me know when you are done.
Hong, I note you left "Milestone: ATLAS LAr Frontend Analog Down Select"
at 0%. Don't you think you should say this is complete?
Regards,
John
On 3/31/19 11:24 AM, Ma, Hong wrote:
I enter the following to the spreadsheet. I note
the
previous status as of Nov, and the current status of March.
ASIC460130: preprototype2 Final design
Nov report: 90%, expected completion 12/4/2018
March report: 100%, actual completion, 12/4/2018
ASIC460140: Submission
Nov Report: 50% expected completion: 12/5/2018
March report: 100%, actual completion 12/6/2018
ASIC460150: Pre-Prototype2 ASIC Fabrication and Preparation for Testing
and Preparation for Testing
Nov report: 0%
March Report: 100%. 12/7/2018 to 2/28/2019
ASIC460160: Pre-Prototype2 ASIC Packaging and Preparation for Testing
and Preparation for Testing
Nov report: 0%
March report 100%, 3/1/2019 to 3/25/2019
ASIC460160M: Material for preprototype2
Nov report: 100% completed.
ASIC460180: Pre-Prototype2 Main Board Schematics Design and Preparation
for Testing
Nov report: 90%, expected completion 12/15/2018
March Report: 100%, actual: 1/15/2019
ASIC460190: Pre-prototype2 Main Board Layout Design
Nov report: 0%
March report: 100%, actual: 1/15/2019 to 2/28/2019
ASIC460200: Pre-Prototype2 Main Board Fabrication
ASIC460200M: Material for Pre-Prototype2 Main Board Fabrication
Nov report 0%
March report: 95% complete. Actual start: 3/1/2019, expected
4/5/2019
ASIC460200T:
0%
ASIC460210: Pre-Prototype2 ASIC Evaluation Test
Nov report: 0%
March report:: 5% complete, actual start 3/29/2019, expected
completion 4/30/2019
Hong.
*From: *Usatlas-hllhc-lartl2l3-l
<usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov
<mailto:usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov>> on behalf
of John
Parsons <parsons AT nevis.columbia.edu <mailto:parsons AT nevis.columbia.edu>>
*Date: *Friday, March 29, 2019 at 2:34 PM
*To: *"usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
<mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>"
<usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
<mailto:usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>>
*Subject: *[Usatlas-hllhc-lartl2l3-l] Fwd: Re:
[Usatlas-hllhc-l2l3ics-l]
Schedule status sheets
FYI, we need to fill out a new statusing. Instructions are
given below. Please take care of this asap.
John
-------- Forwarded Message --------
Subject: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets
Date: Tue, 26 Mar 2019 20:14:28 +0000
From: Freedman, Rhoumela <rfreedman AT bnl.gov
<mailto:rfreedman AT bnl.gov> <mailto:rfreedman AT bnl.gov>
<mailto:rfreedman AT bnl.gov%3e>>
To: Novakova, Penka N <penka AT bnl.gov <mailto:penka AT bnl.gov>
<mailto:penka AT bnl.gov> <mailto:penka AT bnl.gov%3e>>,
'usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov%3e>'
<usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov%3e>>
Hi everyone,
I created Filter views under people’s last names. Let me know if you
have any questions.
Thank you,
Rhoumela
*From:* Novakova, Penka N
*Sent:* Tuesday, March 26, 2019 11:13 AM
*To:* 'usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov%3e>'
<usatlas-hllhc-l2l3ics-l AT lists.bnl.gov
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>
<mailto:usatlas-hllhc-l2l3ics-l AT lists.bnl.gov%3e>>
*Cc:* Freedman, Rhoumela <rfreedman AT bnl.gov
<mailto:rfreedman AT bnl.gov> <mailto:rfreedman AT bnl.gov>
<mailto:rfreedman AT bnl.gov%3e>>;
Kotcher, Jonathan
<kotcher AT bnl.gov <mailto:kotcher AT bnl.gov> <mailto:kotcher AT bnl.gov>
<mailto:kotcher AT bnl.gov%3e>>; Gustaaf Brooijmans
(gusbroo AT nevis.columbia.edu <mailto:gusbroo AT nevis.columbia.edu>
<mailto:gusbroo AT nevis.columbia.edu>
<mailto:gusbroo AT nevis.columbia.edu%3e>)
<gusbroo AT nevis.columbia.edu <mailto:gusbroo AT nevis.columbia.edu>
<mailto:gusbroo AT nevis.columbia.edu>
<mailto:gusbroo AT nevis.columbia.edu%3e>>; Hal
Evans (hgevans AT indiana.edu <mailto:hgevans AT indiana.edu>
<mailto:hgevans AT indiana.edu> <mailto:hgevans AT indiana.edu%3e>)
<hgevans AT indiana.edu <mailto:hgevans AT indiana.edu>
<mailto:hgevans AT indiana.edu> <mailto:hgevans AT indiana.edu%3e>>;
Michael Tuts
(tuts AT pmtuts.net <mailto:tuts AT pmtuts.net> <mailto:tuts AT pmtuts.net>
<mailto:tuts AT pmtuts.net%3e>) <tuts AT pmtuts.net <mailto:tuts AT pmtuts.net>
<mailto:tuts AT pmtuts.net> <mailto:tuts AT pmtuts.net%3e>>;
Heidi Crookston <heidi.crookston AT mrcpmcs.com
<mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com%3e>>
(heidi.crookston AT mrcpmcs.com <mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com%3e>)
<heidi.crookston AT mrcpmcs.com <mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com>
<mailto:heidi.crookston AT mrcpmcs.com%3e>>; Carrie
Sauter <carrie.sauter AT mrcpmcs.com <mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com%3e>>
(carrie.sauter AT mrcpmcs.com <mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com%3e>)
<carrie.sauter AT mrcpmcs.com <mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com>
<mailto:carrie.sauter AT mrcpmcs.com%3e>>
*Subject:* Schedule status sheets
Dear All,
Following the major schedule updates, we are starting monthly status
reporting. At this time we ask you to report on the status of work done
*through March 31, 2019*.
The files are in google docs and need to be updated online – DO NOT
download the files.
* 6.01 – Pixels -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1Qc7S23PmobeTMoenfdMpmW0ber8JMDBE7rsvKlO-2DvtY&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=fZNERTmC_VbH0ksN5hhvP2eCgbw-J0ZYtM9VhCVaklg&e=
* 6.02 – Strips -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D16RtNpI1DxXFP5BGgH8iVEygApJlxJzAItkATXK7Ju8w&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=S4-lbKyLEj2ql8asR33p8fcC79HoH8o3T-6Pn7KaCgg&e=
* 6.03 – Global Mechanics -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1Ed4bJSV4b1I2ioNdJHB5g-2DydLahEEgAXAMHlBWcQ7jk&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=DQZN7y0QLyvPgfP35DQ0qSIw8fWPUXnJHYi0_stkUjY&e=
* 6.04 – LAr -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1oqq6r13SL9LcGXSSlRXXMnDzBI5RNZwOE8pXi-2D-5FAaSc&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=Z6OeIxZaOXcs8EvhCoOylNJ4xd3GTGj5rwSMvMn7QQE&e=
* 6.05 – Tile -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1RuJIWHBimfrFUSGKfzzQ6JvXxsoyD36YMHixGfpJRhg&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=iCSpjVaLkptYOTVvNYHERXOiZKWnjOKb8m3TlN9J9f4&e=
* 6.06 – Muon -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D182rrhilZvzKUKJ-5FRZMtCaBWD4OMM2VOea60y6CShJbI&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=VRVoUrB49BRH6hWO0Wqd-_h5DE2djzZIif7VLyUBTgw&e=
* 6.07 – DAQ -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1qsgHhLuuIAaO9tRwREmLQYIll5TdaNF-5Fti-2DSTZyiPmg&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=CXAWdBEypsJOo9CYZfHrLhz2TlNyExKFxOG14S2JGiQ&e=
* 6.08 Trigger -
https://urldefense.proofpoint.com/v2/url?u=https-3A__drive.google.com_open-3Fid-3D1K-2Dbv9ae7l-2DoES-2DHjgCaySnJtH8Y4ITe9dYGEbo26u80&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=svdlnT81I_YnQMArmpmY-yyBw_DMIB2gXaGMd-dsZb8&e=
The reports are at L2. The CAMs can filter for their name in column C
and the ICs can filter for their institute in column D. The previous
status is available in column J - “Prior % complete”. In some cases
activity IDs have been changed so we had to map the "Prior % complete”
to the activities. Please excuse us if there are some inconsistencies.
We hope to resolved this next month and the following months when P6 is
updated with latest status. The report contain activities for many
months and therefore they are fairly large. We kept the 100% completed
activities for you to review.
Please provide status in columns K, L, M and N. Make sure that you enter
the actual start date for all started activities and finish date for all
activities that are 100% completed, this information is crucial when we
update the schedule in P6. If the activity is completed but you do not
remember the exact start and finish dates you can enter your best
estimate or copy the dates from columns H and I. All activities that
have been completed/started between December 1, 2018 and March 31, 2019
need to be statussed. In actual start/finish dates do NOT enter dates
after March 31, 2019, this confuses the system.
Please complete the status reports by Tuesday, April 2.
We expect that the L2 managers and deputies will notify us (Penka,
Heidi, Carrie) as soon as the status for their system is complete.
Let us know if you have any questions, and also any comments to make the
process smoother and more user-friendly.
Thank you for your cooperation.
Penka, Heidi, Carrie
Penka Novakova
U.S. ATLAS HL-LHC Project Office
Bldg. 510
Brookhaven National Lab
Upton, NY 11973
Tel. 631-344-2502
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu <mailto:parsons AT nevis.columbia.edu>
Columbia UniversityPhone: (914) 591-2820
P.O. Box 137Fax: (914) 591-8120
Irvington, NY 10533WWW: https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=7qPderrGf_Dl_btQLmxVng&m=ethwxo618opIgogZGJrb_JKffPs5eONDjN-rKaq6rlA&s=nj42Zc5cqL4Rs0FlozphxdzHE4xLDQgeVyqKDq0n7Y4&e=
______________________________________________________________________
--
______________________________________________________________________
John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.nevis.columbia.edu_-7Eparsons_&d=DwIDaQ&c=aTOVZmpUfPKZuaG9NO7J7Mh6imZbfhL47t9CpZ-pCOw&r=DSVO6Re8kg14S-cQbkBC2zfSx6Yt2GtkcD3fTWOeyfXXTwIA3TKWV-phDKykUKDr&m=lmIBuZDgkw-qAfVc4VPUxKWoe4zCBl-LX3RAQcx3F1A&s=CCJorDq_CRDll5PhByFC-OucirsrW3CW3rMC474Sn8s&e=
______________________________________________________________________
-
[Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
John Parsons, 03/29/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
Ma, Hong, 03/31/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
John Parsons, 03/31/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
Ma, Hong, 03/31/2019
- Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets, John Parsons, 03/31/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
Ma, Hong, 03/31/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
John Parsons, 03/31/2019
-
Re: [Usatlas-hllhc-lartl2l3-l] Fwd: Re: [Usatlas-hllhc-l2l3ics-l] Schedule status sheets,
Ma, Hong, 03/31/2019
Archive powered by MHonArc 2.6.24.