  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks
  • Date: Sat, 1 Apr 2023 15:10:24 -0400


Hi all,

As we discussed, I have gone through the various BCPs and produced a table summarizing the delays for each L3. I have put this new table in the draft of my FEB2 "Cost&Schedule" slides, and uploaded them to yesterday's Indico (https://indico.bnl.gov/event/18946/). The table is all I have done so far on those new slides so far, and it is on p. 7 of those slides; Tim and Andy should put a similar slide with a copy of the same table in their L3 Cost&Schedule slides.
As additional info, here are the milestones I used to quantify the delays at L3, and their respective dates currently and at the start of the MREFC:

6.4.1
FEE20940 (Milestone: ADC Production Complete)
Current date: 24-Jun-25
MREFC start date: 9-Jan-24

6.4.3
BEE11060 (Milestone: BE Acceptance Test Complete)
Current date: 30-Sep-26
MREFC start date: 3-Jan-25

Regards,
John
--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!FV51tfDSbKev3_E3ZAMJpVMgPOkM9ur-Hg1Z5AKoKJoH1AnlZSVcf9cbVu7rUBpVzqXsyTY93vCoQc3bc6ChZMUKbYXK21ZpZhQmvo0WzmYfwA$


______________________________________________________________________




Archive powered by MHonArc 2.6.24.

Top of Page