Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks
- From: Tim Andeen <tandeen AT utexas.edu>
- To: Andy Haas <andy.haas AT nyu.edu>
- Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
- Subject: Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks
- Date: Mon, 3 Apr 2023 14:56:34 -0700
Hi John,
Tim/Andy, how are you coming with the "cost and schedule" slides?
I should have time tomorrow afternoon. -Tim
On Apr 3, 2023 at 3:43:39 PM, Andy Haas <andy.haas AT nyu.edu> wrote:
I just finished a draft... (also uploaded to the agenda):
https://urldefense.com/v3/__https://docs.google.com/presentation/d/1MCdLnGynBkoLT498P19bdY7UjZnBHQyhEXkebIMqnug/edit?usp=sharing__;!!P4SdNyxKAPE!APIt2pIF-DpVhpDPYzfcZ_B-WJ6BLkqS1wQwDB2N-OIRcMj78HacaU8MB4_e-sMyJ6WXukGFF3Nb1Rb9OGSlGYI7GmmQd8lAr8dJQZlp$
On Mon, Apr 3, 2023 at 2:37 PM John Parsons <parsons AT nevis.columbia.edu> wrote:Tim/Andy, how are you coming with the "cost and schedule" slides? Itwould be good to have a draft soon so that we can check for consistency,etc.JohnOn 4/1/23 6:49 PM, Ma, Hong wrote:> Hi John,>> Some comments on your L3 slides.>> Slide 2: docdb for traceability table should be the same as BOE (24). But somehow your docdb for BOE does not have the traceability sheet. Are you updating it?>> Slide 3: The left table for cost has truncated numbers, such as 709,75, it should be 709,759 .>> Slide 5: “Total Direct Cost”: This should be Total Cost. Direct Cost usually means cost before escalation, and overhead.>> Hong.>> From: Usatlas-hllhc-lartl2l3-l <usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>> Date: Saturday, April 1, 2023 at 3:59 PM> To: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>> Subject: Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks>> I completed most of the rest of the new Cost&Schedule slides for the> FEB2, leaving just the "guided drilldown" to do still. I updated my> slides at https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_18946_&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=kyEj54lOKuwirimqNXMQxkahVVoysn8lyvo4PBMDvKs&e= .>> John>> On 4/1/23 3:10 PM, John Parsons wrote:>>>> Hi all,>>>> As we discussed, I have gone through the various BCPs and produced>> a table summarizing the delays for each L3. I have put this new table in>> the draft of my FEB2 "Cost&Schedule" slides, and uploaded them to>> yesterday's Indico (https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_18946_&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=kyEj54lOKuwirimqNXMQxkahVVoysn8lyvo4PBMDvKs&e= ). The table is>> all I have done so far on those new slides so far, and it is on p. 7 of>> those slides; Tim and Andy should put a similar slide with a copy of the>> same table in their L3 Cost&Schedule slides.>> As additional info, here are the milestones I used to quantify the>> delays at L3, and their respective dates currently and at the start of>> the MREFC:>>>> 6.4.1>> FEE20940 (Milestone: ADC Production Complete)>> Current date: 24-Jun-25>> MREFC start date: 9-Jan-24>>>> 6.4.3>> BEE11060 (Milestone: BE Acceptance Test Complete)>> Current date: 30-Sep-26>> MREFC start date: 3-Jan-25>>>> Regards,>> John>> --> ______________________________________________________________________>> John Parsons> Nevis Labs, Email: parsons AT nevis.columbia.edu> Columbia University Phone: (914) 591-2820> P.O. Box 137 Fax: (914) 591-8120> Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!H1bdSGEZw4cnp8h6bBjryBovLY9BdrusbICvb1q1J0X8AVD2IXCFzEzCxAobj4-egtVqUOah1SjQdw2LgICC5yVEnwJUJXzAx-OiRMWW5wCb0w$<https://urldefense.com/v3/__http:/www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!H1bdSGEZw4cnp8h6bBjryBovLY9BdrusbICvb1q1J0X8AVD2IXCFzEzCxAobj4-egtVqUOah1SjQdw2LgICC5yVEnwJUJXzAx-OiRMWW5wCb0w$>>> ______________________________________________________________________> _______________________________________________> Usatlas-hllhc-lartl2l3-l mailing list> Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov> https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_usatlas-2Dhllhc-2Dlartl2l3-2Dl&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=Fm8ZCWiX1LbLV49tjdoTGT0ocF1yWiWyviefgl0eeIw&e=>--______________________________________________________________________John ParsonsNevis Labs, Email: parsons AT nevis.columbia.eduColumbia University Phone: (914) 591-2820P.O. Box 137 Fax: (914) 591-8120Irvington, NY 10533 WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Dk3CPT16kTxrBmELX_YifUfH_dC_VCnrxrxyMwbkxNO9o7C4NKgQjkj0aaTDNBdXxMXPOSMlGIeGoivFDydwhAQJMVue4Qq_29ZtH1h2sMapew$_____________________________________________________________________________________________________________________Usatlas-hllhc-lartl2l3-l mailing listUsatlas-hllhc-lartl2l3-l AT lists.bnl.govhttps://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_usatlas-2Dhllhc-2Dlartl2l3-2Dl&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=Fm8ZCWiX1LbLV49tjdoTGT0ocF1yWiWyviefgl0eeIw&e=_______________________________________________
Usatlas-hllhc-lartl2l3-l mailing list
Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-lartl2l3-l
-
[Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
John Parsons, 04/01/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
John Parsons, 04/01/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Ma, Hong, 04/01/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, John Parsons, 04/02/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
John Parsons, 04/03/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Andy Haas, 04/03/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, Tim Andeen, 04/03/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
John Parsons, 04/04/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Tim Andeen, 04/04/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, Ma, Hong, 04/04/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, John Parsons, 04/05/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, Ma, Hong, 04/05/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, Timothy R Andeen, 04/05/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, Andy Haas, 04/05/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Tim Andeen, 04/04/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Andy Haas, 04/04/2023
- Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks, John Parsons, 04/05/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Andy Haas, 04/03/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
Ma, Hong, 04/01/2023
-
Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks,
John Parsons, 04/01/2023
Archive powered by MHonArc 2.6.24.