usatlas-hllhc-lartl2l3-l - Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: Andy Haas <andy.haas AT nyu.edu>
  • To: John Parsons <parsons AT nevis.columbia.edu>
  • Cc: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks
  • Date: Mon, 3 Apr 2023 14:43:39 -0600

I just finished a draft... (also uploaded to the agenda):
https://urldefense.com/v3/__https://docs.google.com/presentation/d/1MCdLnGynBkoLT498P19bdY7UjZnBHQyhEXkebIMqnug/edit?usp=sharing__;!!P4SdNyxKAPE!APIt2pIF-DpVhpDPYzfcZ_B-WJ6BLkqS1wQwDB2N-OIRcMj78HacaU8MB4_e-sMyJ6WXukGFF3Nb1Rb9OGSlGYI7GmmQd8lAr8dJQZlp$


On Mon, Apr 3, 2023 at 2:37 PM John Parsons <parsons AT nevis.columbia.edu>
wrote:
>
>
> Tim/Andy, how are you coming with the "cost and schedule" slides? It
> would be good to have a draft soon so that we can check for consistency,
> etc.
>
> John
>
> On 4/1/23 6:49 PM, Ma, Hong wrote:
> > Hi John,
> >
> > Some comments on your L3 slides.
> >
> > Slide 2: docdb for traceability table should be the same as BOE (24). But
> > somehow your docdb for BOE does not have the traceability sheet. Are you
> > updating it?
> >
> > Slide 3: The left table for cost has truncated numbers, such as 709,75,
> > it should be 709,759 .
> >
> > Slide 5: “Total Direct Cost”: This should be Total Cost. Direct Cost
> > usually means cost before escalation, and overhead.
> >
> > Hong.
> >
> > From: Usatlas-hllhc-lartl2l3-l
> > <usatlas-hllhc-lartl2l3-l-bounces AT lists.bnl.gov> on behalf of John
> > Parsons <parsons AT nevis.columbia.edu>
> > Date: Saturday, April 1, 2023 at 3:59 PM
> > To: usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
> > <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
> > Subject: Re: [Usatlas-hllhc-lartl2l3-l] delay table for L3 talks
> >
> > I completed most of the rest of the new Cost&Schedule slides for the
> > FEB2, leaving just the "guided drilldown" to do still. I updated my
> > slides at
> > https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_18946_&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=kyEj54lOKuwirimqNXMQxkahVVoysn8lyvo4PBMDvKs&e=
> > .
> >
> > John
> >
> > On 4/1/23 3:10 PM, John Parsons wrote:
> >>
> >> Hi all,
> >>
> >> As we discussed, I have gone through the various BCPs and produced
> >> a table summarizing the delays for each L3. I have put this new table in
> >> the draft of my FEB2 "Cost&Schedule" slides, and uploaded them to
> >> yesterday's Indico
> >> (https://urldefense.proofpoint.com/v2/url?u=https-3A__indico.bnl.gov_event_18946_&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=kyEj54lOKuwirimqNXMQxkahVVoysn8lyvo4PBMDvKs&e=
> >> ). The table is
> >> all I have done so far on those new slides so far, and it is on p. 7 of
> >> those slides; Tim and Andy should put a similar slide with a copy of the
> >> same table in their L3 Cost&Schedule slides.
> >> As additional info, here are the milestones I used to quantify the
> >> delays at L3, and their respective dates currently and at the start of
> >> the MREFC:
> >>
> >> 6.4.1
> >> FEE20940 (Milestone: ADC Production Complete)
> >> Current date: 24-Jun-25
> >> MREFC start date: 9-Jan-24
> >>
> >> 6.4.3
> >> BEE11060 (Milestone: BE Acceptance Test Complete)
> >> Current date: 30-Sep-26
> >> MREFC start date: 3-Jan-25
> >>
> >> Regards,
> >> John
> >
> > --
> > ______________________________________________________________________
> >
> > John Parsons
> > Nevis Labs, Email: parsons AT nevis.columbia.edu
> > Columbia University Phone: (914) 591-2820
> > P.O. Box 137 Fax: (914) 591-8120
> > Irvington, NY 10533 WWW:
> > https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!H1bdSGEZw4cnp8h6bBjryBovLY9BdrusbICvb1q1J0X8AVD2IXCFzEzCxAobj4-egtVqUOah1SjQdw2LgICC5yVEnwJUJXzAx-OiRMWW5wCb0w$<https://urldefense.com/v3/__http:/www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!H1bdSGEZw4cnp8h6bBjryBovLY9BdrusbICvb1q1J0X8AVD2IXCFzEzCxAobj4-egtVqUOah1SjQdw2LgICC5yVEnwJUJXzAx-OiRMWW5wCb0w$>
> >
> > ______________________________________________________________________
> > _______________________________________________
> > Usatlas-hllhc-lartl2l3-l mailing list
> > Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
> > https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_usatlas-2Dhllhc-2Dlartl2l3-2Dl&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=Fm8ZCWiX1LbLV49tjdoTGT0ocF1yWiWyviefgl0eeIw&e=
> >
>
> --
> ______________________________________________________________________
>
> John Parsons
> Nevis Labs, Email: parsons AT nevis.columbia.edu
> Columbia University Phone: (914) 591-2820
> P.O. Box 137 Fax: (914) 591-8120
> Irvington, NY 10533 WWW:
> https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Dk3CPT16kTxrBmELX_YifUfH_dC_VCnrxrxyMwbkxNO9o7C4NKgQjkj0aaTDNBdXxMXPOSMlGIeGoivFDydwhAQJMVue4Qq_29ZtH1h2sMapew$
>
> ______________________________________________________________________
> _______________________________________________
> Usatlas-hllhc-lartl2l3-l mailing list
> Usatlas-hllhc-lartl2l3-l AT lists.bnl.gov
> https://urldefense.proofpoint.com/v2/url?u=https-3A__lists.bnl.gov_mailman_listinfo_usatlas-2Dhllhc-2Dlartl2l3-2Dl&d=DwIGaQ&c=slrrB7dE8n7gBJbeO0g-IQ&r=y4qQBOsjsdgJNx-_8SvpS9786vHE4GOddPXp1ozJgWc&m=aMD2R-p5dz8WLlRAEB6IaqgBH_M27wi_yPm4PRXoDuuPfK1rzAT-E8my6iIFZ2En&s=Fm8ZCWiX1LbLV49tjdoTGT0ocF1yWiWyviefgl0eeIw&e=




Archive powered by MHonArc 2.6.24.

Top of Page