Skip to Content.
Sympa Menu

usatlas-hllhc-lartl2l3-l - Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2l3ics-l] ] [Usatlas-hllhc-l2l3ics-l] July 2024 Status Sheets

usatlas-hllhc-lartl2l3-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade LAr Level 2 and Level 3 Managers Mailing List

List archive

Chronological Thread  
  • From: John Parsons <parsons AT nevis.columbia.edu>
  • To: "usatlas-hllhc-lartl2l3-l AT lists.bnl.gov" <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
  • Subject: Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2l3ics-l] ] [Usatlas-hllhc-l2l3ics-l] July 2024 Status Sheets
  • Date: Fri, 26 Jul 2024 13:58:52 -0400


Hi all,

I forgot to ask in our mtg if you can successfully access the status google sheet. I am getting an error msg when I try, but with the PO we don't understand why. Can you please just try load the status sheet now and let me know if it works or you get an error?
Thanks,
John

On 7/25/24 4:39 PM, Timothy Robert Andeen wrote:
Hi John,

Done with the status sheets. Bullets below.

Best, Tim

*ADC:*

* Packaging of first production wafers in progress at JCET. Necessary
to iterate on marking design to include lot numbers. Expect 13k
packaged chips in August (1 wafer from each production lot,
remainder of engineering run chips).
* Priming of packaging in progress.
* 200 good, tested chips and documentation sent to Nevis for FEB2
prototypes for half crate test.
* 1 tray (about 200) untested chips sent to Saclay for testing and
half crate test preparations (tested chips to be sent to Nevis by
end of September).
* Robotic test-stand (RTS) again encountered issues with socket
performance. Investigations of cleaning and connections made.
Socket-PCB pads connection likely source of performance issues.
Assembling remaining bare board without tinning on pads.
* Coordination with Saclay on QC parameters ongoing.
Improving/synchronizing parameter calculations.
* Schematic design and layout for rad. board complete. Purchase order
for board fab. in progress, likewise assembly.

*OPTICS*:

* Received 2300 VTRx+ so far (expected 50%, or 7000, in current
schedule). Delay due to production and QC at CERN.
* VTRx+ link to MTP connectors in progress. Updated quote for
connectorization of full production in progress.
* Data and Control links: MTP connectors available in lab, testing in
progress.
* Optical fiber saddles and standoff fabrication investigated. Confirm
halogen-free material. Custom tool production ordered (18 wk lead)
to be ready for half crate test.
* QC test setups in preparation. Studying need of optical spectrum
analyzer.

*From: *usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l-request AT lists.bnl.gov> on behalf of John Parsons <parsons AT nevis.columbia.edu>
*Date: *Thursday, July 25, 2024 at 10:52 AM
*To: *usatlas-hllhc-lartl2l3-l AT lists.bnl.gov <usatlas-hllhc-lartl2l3-l AT lists.bnl.gov>
*Subject: *Re: [[Usatlas-hllhc-lartl2l3-l] ] Fwd: [[Usatlas-hllhc-l2l3ics-l] ] [Usatlas-hllhc-l2l3ics-l] July 2024 Status Sheets


A reminder these are overdue.  Please take care of both asap.

                John

On 7/19/24 8:17 AM, John Parsons wrote:

Hi all,

      It is status and technical bullets time again; please complete both by COB Wed. (July 24).
      Regards,
          John

-------- Forwarded Message --------
Subject:     [[Usatlas-hllhc-l2l3ics-l] ] [Usatlas-hllhc-l2l3ics-l] July 2024 Status Sheets
Date:     Thu, 18 Jul 2024 20:20:22 +0000
From:     Smith, Rosemarie <rsmith2 AT bnl.gov>
Reply-To:     Smith, Rosemarie <rsmith2 AT bnl.gov>
To:     Usatlas-hllhc-l2l3ics-l AT lists.bnl.gov <usatlas-hllhc-l2l3ics-l AT lists.bnl.gov>



Dear Team:

The Status sheets for July 2024 are now available in google docs:

                                 Please note: The activities with baseline start dates in the past are highlighted in orange so you can see how this impact your monthly performance.

    * *6.01 Pixels:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/18_SKWIpvPi_nWr86UoWYKNhvmxxL2utb2MEFjslxai8/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBnBQGoZA$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/18_SKWIpvPi_nWr86UoWYKNhvmxxL2utb2MEFjslxai8/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBnBQGoZA$
>**
    * *6.02 Strips:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1uQvH21x269b1VS-gi89CkiwgFj9gyfMWlPCGClRpN7A/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWAiEToBeA$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1uQvH21x269b1VS-gi89CkiwgFj9gyfMWlPCGClRpN7A/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWAiEToBeA$
>**
    * *6.03 Global Mechanics:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Xun-1BoxgXDaMMJ-p0X7_B0sLg1928U6mzvipJr9AIw/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBdBexuTg$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Xun-1BoxgXDaMMJ-p0X7_B0sLg1928U6mzvipJr9AIw/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBdBexuTg$
>**
    * *6.04 LAr:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Rj6y-ZjxHDwqopmJ9867ewOdbyBfifDipOaaANeVz70/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWB30Z9hRA$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Rj6y-ZjxHDwqopmJ9867ewOdbyBfifDipOaaANeVz70/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWB30Z9hRA$
>**
    * *6.05 Tiles:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1mh5e6sVOgv0WfJyHt4unhSvgnMHZ5JXtvh6-cDVvwwk/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWCeJj73GA$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1mh5e6sVOgv0WfJyHt4unhSvgnMHZ5JXtvh6-cDVvwwk/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWCeJj73GA$
>**
    * *6.06 Muon:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1vUb39ks5sp3YPtItkBvOtjdcNlrF-aeB9dDBSUpjrKs/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBd1PVJ2Q$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1vUb39ks5sp3YPtItkBvOtjdcNlrF-aeB9dDBSUpjrKs/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWBd1PVJ2Q$
>**
    * *6.07 DAQ:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Xnyu2UJJ1J89Gv3Xnw9Hn58EUdCuMkpgG4y1Ss0D2QI/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWAa3nkdQw$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1Xnyu2UJJ1J89Gv3Xnw9Hn58EUdCuMkpgG4y1Ss0D2QI/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWAa3nkdQw$
>**
    * *6.08 Trigger:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1n9_urQ9kg6jQjERbsj20e9K7ug1yZWHPGHb5EMIhehg/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWCNXvhx-A$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1n9_urQ9kg6jQjERbsj20e9K7ug1yZWHPGHb5EMIhehg/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWCNXvhx-A$
>**
    * *6.11 Installation & Integration:

*https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1I0KCZbrmyi3j8os0NmRlDAY437ldz36NcorLgn-0L80/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWD6aS7xLA$
<https://urldefense.com/v3/__https://docs.google.com/spreadsheets/d/1I0KCZbrmyi3j8os0NmRlDAY437ldz36NcorLgn-0L80/edit?usp=sharing__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWD6aS7xLA$
>**

**

Please remember to update the status online – *_DO NOT_* Download the files.

The reports contain activities for *July 2024 ~ December 2024*. You can filter for your CAM’s name within column D.

***PLEASE NOTE THE FOLLOWING INSTRUCTIONS IN FILLING OUT THE STATUS SHEETS:***

   1. Please provide the status in columns: *L, M, N, O, and S*. Make sure
      you provide the “*Expected Finish*” date(column *O*) for all
      activities in progress. This is important for us to re-calculate
      EAC, the float, and the critical path.
   2. The remaining units are calculated based on the original duration of
      the activity and the percentage completed. Please provide “*Units to
      Complete*” (column *S*) for activities in progress. It is if you
      expect to use more or less labor for a specific task to be completed
      or the cost for material/travel is different than originally
      planned. Total Cost per resource from P6, is shown in column *T
      *(“*Planned Cost*”). The “*Remaining Cost*” (based on the remaining
      units from P6), is in column *U*; the “*Updated Remaining Cost*”
      (column *V*), also called: ETC or Estimate-to-Complete); the
      “*Updated Total Cost*” (column *W*) also called: (EAC or Estimate at
      Complete, calculated based on updated units); and the *Delta EAC
      minus baseline cost* (column *X*); are formula fields that provide
      calculations on how the cost changes when the Remaining Units are
      adjusted.
   3. Make sure that you enter the actual start date for all started
      activities and finish date for all activities that are 100%
      completed. All *_NEW_* actual start and finish dates *_MUST BE_*
      within the current reporting period.
   4. Do *NOT* change the actual start dates if they are already in the
      spreadsheet – EVMS does not allow changing the past. If the actual
      start date was entered incorrectly in the previous month, just leave
      it as it is.
   5. Do *NOT* enter dates after *_July 31, 2024_*, in actual start/finish
      dates (columns *M* and *N*); this creates errors in P6.
   6. Do *NOT* decrease the percentage complete in column *L*.
   7. Do *NOT* write any notes in the spreadsheet. If you want to add a
      comment use column *Y*.
   8. Do *NOT* change the formatting of the cell once you edit it. The
      spreadsheet will automatically highlight the change in *YELLOW*.

*_Additional Note_*:

If progress was made on future activities that are not in the status sheet, you can contact your project controls specialist and ask for their help with statussing the activities directly in P6.

*PLEASE Complete the July Status update**_by Friday, July 26^th MORNING_*.

*We expect the L2 managers and deputies will notify Rosemarie as soon as the status of their system is complete*.

Thank you,

Rosemarie

Rosemarie D. Smith

U.S. ATLAS HL-LHC Upgrade Project

Brookhaven National Laboratory
Physics Department, Bldg. 510

PO Box 5000

Upton, NY 11973 -5000
Office: 631.344.3743
rsmith2 AT bnl.gov <mailto:rsmith2 AT bnl.gov <mailto:rsmith2 AT bnl.gov>>

Twitter <https://urldefense.com/v3/__https://twitter.com/BrookhavenLab__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWDIfFM7WA$ > | Facebook <https://urldefense.com/v3/__https://www.facebook.com/brookhavenlab__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWC_rUSnRA$ > | Instagram
<https://urldefense.com/v3/__https://www.instagram.com/brookhavenlab/__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWAllSveOQ$
> | LinkedIn
<https://urldefense.com/v3/__https://www.linkedin.com/company/brookhavenlab/__;!!P4SdNyxKAPE!Hhllh3Q_zmRSZoAtZ9u1UYc62v5gfRKCC4qQBqnbnW46gfFWwYLUNOe4PArQWYO5hV3TSYIKSyV9hzLYwcHa3FDHiEnLbXWtNX0AgWB76Z3ajw$
>


--
______________________________________________________________________

John Parsons
Nevis Labs,              Email: parsons AT nevis.columbia.edu
  Columbia University   Phone: (914) 591-2820
P.O. Box 137            Fax: (914) 591-8120
Irvington, NY 10533     WWW: https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Bd4ln8CFb_PTYlVbBrQfbXWxe2sBuYKcmmxWiN9RgZZ_yj3am5GtiQXDZ7tNsbpmSLpYd_NnWwxL9sSRnb9bDJheNArwtpTzbXfp-D3xFFvIig$ <https://urldefense.com/v3/__http:/www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Bd4ln8CFb_PTYlVbBrQfbXWxe2sBuYKcmmxWiN9RgZZ_yj3am5GtiQXDZ7tNsbpmSLpYd_NnWwxL9sSRnb9bDJheNArwtpTzbXfp-D3xFFvIig$>

______________________________________________________________________


--
______________________________________________________________________

John Parsons
Nevis Labs, Email: parsons AT nevis.columbia.edu
Columbia University Phone: (914) 591-2820
P.O. Box 137 Fax: (914) 591-8120
Irvington, NY 10533 WWW:
https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!Eu27SVzhpOg6Zhet1jSixj0_w_-WPagCqzpPPKlhJ7koatEwIzqGF6yqz4Fao2V_WvazXTptTd6agy-GWGkJmGl1kxV61UaeiuIdWCvsYhwtAQ$


______________________________________________________________________



Archive powered by MHonArc 2.6.24.

Top of Page