Skip to Content.
Sympa Menu

sphenix-emcal-l - Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Test beam data wish list

sphenix-emcal-l AT lists.bnl.gov

Subject: sPHENIX EMCal discussion

List archive

Chronological Thread  
  • From: Abhisek Sen <sen.abhisek AT gmail.com>
  • To: Martin Purschke <purschke AT bnl.gov>, Edward Kistenev <kistenev AT bnl.gov>, Jin Huang <jhuang AT bnl.gov>
  • Cc: "sphenix-emcal-l AT lists.bnl.gov" <sphenix-emcal-l AT lists.bnl.gov>, "sphenix-hcal-l AT lists.bnl.gov" <sphenix-hcal-l AT lists.bnl.gov>
  • Subject: Re: [Sphenix-emcal-l] [Sphenix-hcal-l] Test beam data wish list
  • Date: Sun, 22 Jan 2017 19:19:29 +0000

Martin, 
  OK. Got it. Could you make the transfer automatic? 

Cheers,
Abhisek

On Sun, Jan 22, 2017 at 2:13 PM Martin Purschke <purschke AT bnl.gov> wrote:
Abhisek,

it appears that you are using sphenixdaq to initiate the rsync
processes. *That is wrong!*

You need to start from hcaldaq where the files physically reside. It's
not new from last year.

With sphenixdaq you are dragging the data to sphenixdaq and back out,
which will not improve our event rate for the DAQ.

Best,
        Martin

On 1/22/17 12:16, Abhisek Sen wrote:
> Hi Edward,
>    Please be more explicit in the elog about the details on the runs
> taken. I started the transfer to RCF. I will have a look once it transfer.
>
> Cheers,
> Abhisek
>
> On Sun, Jan 22, 2017 at 11:32 AM Edward Kistenev <kistenev AT bnl.gov
> <mailto:kistenev AT bnl.gov>> wrote:
>
>     Jin, Sunday is HCAL standalone day. We are planning to take ~500k
>     events at each of 4 or 5 energies (30/16/8/4 and maybe 2 GeV/c) -
>     enough data to have ~2k events for every hodoscope crossing. If you
>     have comments, suggestions - welcomed. Would be great to get some
>     insight from this data fast.
>     The first run (30GeV/c mostly negative pions) is 3285.
>
>                             Edward
>
>
>     On Jan 20, 2017, at 9:06 PM, Huang, Jin <jhuang AT bnl.gov
>     <mailto:jhuang AT bnl.gov>> wrote:
>
>     Hi, Martin and all
>
>     Thanks! This flag is very convenient. This switch is incorporated
>     into a not-yet-merged prototype3 production code:
>     https://github.com/blackcathj/coresoftware/commit/3236ced2bc2c604a94ab94cd8f3fa9a1daa9259a
>
>     Now I will also appreciate if someone could point to me the new HBD
>     channel map for high-eta EMCal, which will put here:
>     https://github.com/blackcathj/coresoftware/commit/3236ced2bc2c604a94ab94cd8f3fa9a1daa9259a#diff-4943c7156628a48058c793384d2269b3
>
>     Cheers,
>
>     Jin
>
>     ______________________________
>
>     Jin HUANG, Ph. D.
>
>     Associate Physicist
>     Brookhaven National Laboratory
>     Physics Department, Bldg 510 C
>     Upton, NY 11973-5000
>
>     Office: 631-344-5898 <tel:%28631%29%20344-5898>
>     Cell:   757-604-9946 <tel:%28757%29%20604-9946>
>     ______________________________
>
>
>     > -----Original Message-----
>     > From: sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>
>     [mailto:sphenix-hcal-l- <mailto:sphenix-hcal-l->
>     > bounces AT lists.bnl.gov <mailto:bounces AT lists.bnl.gov>] On Behalf Of
>     Martin Purschke
>     > Sent: Friday, January 20, 2017 6:37 PM
>     > To: sphenix-hcal-l AT lists.bnl.gov <mailto:sphenix-hcal-l AT lists.bnl.gov>
>     > Subject: Re: [Sphenix-hcal-l] Test beam data wish list
>     >
>     > All, especially Jin,
>     >
>     > I started to summarize the current PRDF structure changes as
>     compared to
>     > 2017.
>     >
>     > I added a chapter "What is new in the data structures in 2017" in
>     > https://wiki.bnl.gov/sPHENIX/index.php/2017_calorimeter_beam_test#What
>     > _is_new_in_the_data_structures_in_2017
>     >
>     > Basically we are reading more scalers in packet 910/911, and added one
>     > camera packet 944 (not to let a cam go to waste).
>     >
>     > begin-run packet 905 (just its presence, not content) indicates
>     that the new
>     > (high-eta) emcal is connected. Example code on the Wiki.
>     >
>     > Best,
>     >       Martin
>     >
>     >
>     >
>     > On 1/20/17 16:20, Huang, Jin wrote:
>     >> Hi, John and Martin
>     >>
>     >>
>     >>
>     >> Thanks for the lots of work initiating the test. 8-GeV scan sounds
>     >> like a good plan. And I think Martin's marker packet in PRDF will be
>     >> very useful for analysis too (good to have a copy in numerical
>     format too).
>     >>
>     >>
>     >>
>     >>> I didn't understand the suggestion in the PbGl item in the
>     >>
>     >>> wiki to "make sure timing peak of the lead glass data is stable with
>     >> in one
>     >>
>     >>> BCO."
>     >>
>     >>
>     >>
>     >> Hmm. I guess I should say move the PbGL signal earlier in the sample
>     >> train. In the past run 2016, the PbGL was recorded with peak around
>     >> sample 15-21. Almost for all events, the tail of ADC spectrum just
>     >> fall off the cliff beyond max sample of 24. Although one can
>     still fit
>     >> for the max, this prevented us to perform an analysis of 1100V to
>     >> 1200V comparison by just integrate the ADC count (although signal
>     >> shape could change between two HV settings, presumably the ADC
>     >> integral remain the same.). Example 2016 data shown below.
>     >>
>     >>
>     >>
>     >> Therefore, the request I meant is to move the PbGL trigger to come
>     >> 100-150ns later, so we could sample the whole curve. Wiki updated.
>     >>
>     >>
>     >>
>     >>
>     >>
>     >>> To make this data widely useful, we'll need to run the
>     production and
>     >> look at
>     >>
>     >>> it--that can be done remotely if we update the wiki with runs
>     that we
>     >>> deem
>     >>
>     >>> worth analyzing.
>     >>
>     >>
>     >>
>     >> A wiki run list will be useful. Just chat with Chris, that we will
>     >> setup a new code base for prototype-3 analysis and decouple it with
>     >> prototype-2. A channel map will be useful in setting up the PRDF
>     >> unpacker. Most other infrastructure should be similar. When
>     production
>     >> is setup, I also need to work on the analysis tutorial ...
>     >>
>     >>
>     >>
>     >> Cheers
>     >>
>     >>
>     >>
>     >> Jin
>     >>
>     >>
>     >>
>     >>
>     >>
>     >> ______________________________
>     >>
>     >>
>     >>
>     >> Jin HUANG, Ph. D.
>     >>
>     >>
>     >>
>     >> Associate Physicist
>     >>
>     >> Brookhaven National Laboratory
>     >>
>     >> Physics Department, Bldg 510 C
>     >>
>     >> Upton, NY 11973-5000
>     >>
>     >>
>     >>
>     >> Office: 631-344-5898 <tel:%28631%29%20344-5898>
>     >>
>     >> Cell:   757-604-9946 <tel:%28757%29%20604-9946>
>     >>
>     >> ______________________________
>     >>
>     >>
>     >>
>     >>
>     >>
>     >>> -----Original Message-----
>     >>
>     >>> From: sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>
>     [mailto:sphenix-hcal-l- <mailto:sphenix-hcal-l->
>     >>
>     >>> bounces AT lists.bnl.gov <mailto:bounces AT lists.bnl.gov>] On Behalf
>     Of John Haggerty
>     >>
>     >>> Sent: Friday, January 20, 2017 6:18 AM
>     >>
>     >>> To: sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>; sphenix-emcal-l AT lists.bnl.gov
>     <mailto:sphenix-emcal-l AT lists.bnl.gov>
>     >>
>     >>> Subject: Re: [Sphenix-hcal-l] Test beam data wish list
>     >>
>     >>>
>     >>
>     >>> Jin and Abhisek,
>     >>
>     >>>
>     >>
>     >>> Thanks for putting this together, after last week's beamline scare I
>     >> thought
>     >>
>     >>> maybe we better have a plan that would get us some of what we
>     want in
>     >>
>     >>> short order in case the septa failed completely.
>     >>
>     >>>
>     >>
>     >>> Looking over the list and thinking what we need to get done this
>     >> weekend to
>     >>
>     >>> confirm that we have everything connected and working to the best of
>     >>> our
>     >>
>     >>> knowledge, I think we should spend most of our time this weekend at
>     >>
>     >>> -8 GeV and take data at
>     >>
>     >>>
>     >>
>     >>> - sweet spot of EMCAL3
>     >>
>     >>> - PbGl
>     >>
>     >>> - HCAL only
>     >>
>     >>> - sweet spot of EMCAL2
>     >>
>     >>>
>     >>
>     >>> in that order, which will debug/verify the hodoscope, the Cerenkov
>     >> counters,
>     >>
>     >>> our own detectors, and give us some experience with the wire chamber
>     >>> data,
>     >>
>     >>> and would let us exercise new analysis necessary for the
>     >>
>     >>> EMCAL3 (the channel map is new).  It seems to me that ideally, we
>     >>> could
>     >>
>     >>> then produce, albeit with unit calibration constants,
>     resolutions for
>     >> the two
>     >>
>     >>> EMCAL's and the HCAL alone which could be directly compared with
>     last
>     >> year.
>     >>
>     >>>
>     >>
>     >>> In looking at what we've installed and done, I think it would better
>     >>> than
>     >>
>     >>> trying to start with a big calibration scan, before we have fully
>     >> established
>     >>
>     >>> that everything is works and we can analyze it as we did at the end
>     >>> of
>     >> the last
>     >>
>     >>> beam test, and we'll be lucky to get through this in a weekend.
>     >>> Also, it
>     >>
>     >>> doesn't require a lot of beam development, and since the beam has
>     >>> been off
>     >>
>     >>> for so long, there may be startup hiccups when we ask for changed
>     >>
>     >>> conditions.  -8 GeV seems like a good way to start for that reason,
>     >>> and
>     >>
>     >>> because we have a lot of data from last time there.  If we take
>     this,
>     >> have time
>     >>
>     >>> to study it, and are ready to go on, I think the next thing would be
>     >> an energy
>     >>
>     >>> scan in the PbGl.  I didn't understand the suggestion in the PbGl
>     >>> item
>     >> in the
>     >>
>     >>> wiki to "make sure timing peak of the lead glass data is stable with
>     >> in one
>     >>
>     >>> BCO."  As far as I know, there is no way to synchronize the ADC
>     clock
>     >>> with
>     >>
>     >>> beam events, and I hope that nothing we did in the past relied
>     on the
>     >>> peak
>     >>
>     >>> being in any particular sample.
>     >>
>     >>>
>     >>
>     >>> Also, we will be sharing time for the next few days with T-1068,
>     >>> which I
>     >>
>     >>> believe is development of an SVX4-based Si telescope by groups from
>     >>> KEK
>     >>
>     >>> and Osaka for tests of ATLAS pixel and strip detectors, I would
>     guess
>     >> they'll
>     >>
>     >>> want 120 GeV protons, and if we wanted to run parasitically with
>     them
>     >>> (not
>     >>
>     >>> sure we have the person-power to do that), we could in principle
>     take
>     >>> MIP
>     >>
>     >>> calibration data with them in the beam, they should be pretty
>     low mass.
>     >>
>     >>>
>     >>
>     >>> To make this data widely useful, we'll need to run the
>     production and
>     >> look at
>     >>
>     >>> it--that can be done remotely if we update the wiki with runs
>     that we
>     >>> deem
>     >>
>     >>> worth analysing.  We'll have to exercise some care in changing
>     >>> EMCAL's,
>     >>
>     >>> since the geometry and channel map are different, but the data will
>     >>> look
>     >>
>     >>> exactly the same unless we do something to identify it.  We could
>     >> change the
>     >>
>     >>> packet id, I suppose, but that would take the HCAL and hodoscope
>     with it.
>     >>
>     >>> Also, we have to make some changes to the database to account
>     for two
>     >>
>     >>> emcal's and changes to the hcal controller.
>     >>
>     >>>
>     >>
>     >>> On 1/18/17 3:51 PM, Huang, Jin wrote:
>     >>
>     >>>> Hi, Everyone
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> In the HCal meeting today, John Haggerty asked Abhisek and I to
>     >>>> come
>     >>
>     >>>> up with a wish list for key measurements for the on-going beam
>     test.
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Please find a draft EMCal data wish list at this link:
>     >>
>     >>>>
>     >>
>     >>>
>     > https://wiki.bnl.gov/sPHENIX/index.php/2017_calorimeter_beam_test#EMC
>     >>
>     > <https://wiki.bnl.gov/sPHENIX/index.php/2017_calorimeter_beam_test#EM
>     > C
>     >> al_Standalone_Data>
>     >>
>     >>> al_Standalone_Data
>     > <https://wiki.bnl.gov/sPHENIX/index.php/2017_calorimeter_beam_test#EM
>     > Cal_Standalone_Data>.
>     >>
>     >>>> Seven data set was rated high, mid and low. Welcomed to give
>     >>
>     >>>> suggestions or edit the list on wiki.
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Cheers,
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Jin
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> ______________________________
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Jin HUANG, Ph. D.
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Associate Physicist
>     >>
>     >>>>
>     >>
>     >>>> Brookhaven National Laboratory
>     >>
>     >>>>
>     >>
>     >>>> Physics Department, Bldg 510 C
>     >>
>     >>>>
>     >>
>     >>>> Upton, NY 11973-5000
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Office: 631-344-5898 <tel:%28631%29%20344-5898>
>     >>
>     >>>>
>     >>
>     >>>> Cell:   757-604-9946 <tel:%28757%29%20604-9946>
>     >>
>     >>>>
>     >>
>     >>>> ______________________________
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> *From:*sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>
>     >>
>     >>>> [mailto:sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>] *On Behalf Of *John
>     >>
>     >>>> Lajoie
>     >>
>     >>>> *Sent:* Tuesday, January 17, 2017 5:54 PM
>     >>
>     >>>> *To:* Lynch, Don <dlynch AT bnl.gov <mailto:dlynch AT bnl.gov>
>     <mailto:dlynch AT bnl.gov <mailto:dlynch AT bnl.gov>>>;
>     >> sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>
>     <mailto:sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>>
>     >>
>     >>>> *Subject:* Re: [Sphenix-hcal-l] HCAL bi-weekly meeting
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> Hi Don,
>     >>
>     >>>>
>     >>
>     >>>>    Thanks for the update!  I certainly appreciate that you want to
>     >>
>     >>>> keep the engineering meeting tight, but I'll look forward to poking
>     >>
>     >>>> through the slides.
>     >>
>     >>>>
>     >>
>     >>>> John
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> On 1/17/2017 4:51 PM, Lynch, Don wrote:
>     >>
>     >>>>
>     >>
>     >>>>    Hi John,
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    We won't have any Engineering input for tomorrow's meeting, as
>     >>>> we
>     >>
>     >>>>    are meeting with Walt Sondheim on MAPS parameters at the same
>     > time.
>     >>
>     >>>>    We do have a BNL internal Calorimeter engineering meeting on
>     >>>> Friday
>     >>
>     >>>>    to go over Anatoli's latest analyses, Rich's current light
>     >>
>     >>>>    collection design status and general engineering issues for
>     >>
>     >>>>    finalizing HCal mechanical design (steel, light collection,
>     >>>> etc.,
>     >>
>     >>>>    inner and outer) and advancing the EMCal mechanical design.
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    We are not putting this on bluejeans, as we want to keep the
>     >>
>     >>>>    engineering discussion tight, but we will post some slides on
>     >> Indico.
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    - Don Lynch
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    *From: *<sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>
>     >>
>     >>>>    <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov
>     <mailto:sphenix-hcal-l-bounces AT lists.bnl.gov>>> on behalf of
>     >>>> John
>     >>
>     >>>>    Lajoie <lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>
>     <mailto:lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>
>     >> <mailto:lajoie AT iastate.edu
>     <mailto:lajoie AT iastate.edu>%20%3cmailto:lajoie AT iastate.edu
>     <mailto:20%253cmailto%3Alajoie AT iastate.edu>>>>
>     >>
>     >>>>    *Date: *Tuesday, January 17, 2017 at 3:11 PM
>     >>
>     >>>>    *To: *"sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>
>     >>
>     >>>>    <mailto:sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>>"
>     >>>> <sphenix-hcal-l AT lists.bnl.gov <mailto:sphenix-hcal-l AT lists.bnl.gov>
>     >>
>     >>>>    <mailto:sphenix-hcal-l AT lists.bnl.gov
>     <mailto:sphenix-hcal-l AT lists.bnl.gov>>>
>     >>
>     >>>>    *Subject: *[Sphenix-hcal-l] HCAL bi-weekly meeting
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    Dear HCAL'ers:
>     >>
>     >>>>
>     >>
>     >>>>        It's been a while, but we will resume our bi-weekly HCAL
>     >>
>     >>>>    meetings this coming Wednesday, Jan 18th, at 2:30PM BNL
>     time.   The
>     >>
>     >>>>    agenda is evolving here at:
>     >>
>     >>>>
>     >>
>     >>>>    https://indico.bnl.gov/conferenceDisplay.py?confId=2762
>     >>
>     >>>>
>     >>
>     >>>>    I'm hoping we can get an update on the test beam, and maybe
>     >>>> some
>     >>
>     >>>>    additional contributions.
>     >>
>     >>>>
>     >>
>     >>>>    Regards,
>     >>
>     >>>>    John
>     >>
>     >>>>
>     >>
>     >>>>    --
>     >>
>     >>>>
>     >>
>     >>>>    *John Lajoie*
>     >>
>     >>>>
>     >>
>     >>>>    Professor of Physics
>     >>
>     >>>>
>     >>
>     >>>>    Iowa State University
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>    (515) 294-6952 <tel:%28515%29%20294-6952>
>     >>
>     >>>>
>     >>
>     >>>>    lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>
>     <mailto:lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>>
>     >> <mailto:lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>>
>     >>
>     >>>>
>     >>
>     >>>>    Facebook <http://www.facebook.com/john.lajoie.5>LinkedIn
>     >>
>     >>>>    <http://www.linkedin.com/pub/john-lajoie/9/a9/bba/>
>     >>
>     >>>>    Contact me: Skypejohn.lajoie
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> --
>     >>
>     >>>>
>     >>
>     >>>> *John Lajoie*
>     >>
>     >>>>
>     >>
>     >>>> Professor of Physics
>     >>
>     >>>>
>     >>
>     >>>> Iowa State University
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> (515) 294-6952 <tel:%28515%29%20294-6952>
>     >>
>     >>>>
>     >>
>     >>>> lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>
>     <mailto:lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>>
>     >> <mailto:lajoie AT iastate.edu <mailto:lajoie AT iastate.edu>>
>     >>
>     >>>>
>     >>
>     >>>> Facebook <http://www.facebook.com/john.lajoie.5>LinkedIn
>     >>
>     >>>> <http://www.linkedin.com/pub/john-lajoie/9/a9/bba/>
>     >>
>     >>>> Contact me: Skypejohn.lajoie
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>>
>     >>
>     >>>> _______________________________________________
>     >>
>     >>>> Sphenix-hcal-l mailing list
>     >>
>     >>>> Sphenix-hcal-l AT lists.bnl.gov
>     <mailto:Sphenix-hcal-l AT lists.bnl.gov>
>     <mailto:Sphenix-hcal-l AT lists.bnl.gov
>     <mailto:Sphenix-hcal-l AT lists.bnl.gov>>
>     >>
>     >>>> https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
>     >>
>     >>>>
>     >>
>     >>>
>     >>
>     >>>
>     >>
>     >>> --
>     >>
>     >>> John Haggerty
>     >>
>     >>> email: haggerty AT bnl.gov <mailto:haggerty AT bnl.gov>
>     <mailto:haggerty AT bnl.gov <mailto:haggerty AT bnl.gov>>
>     >>
>     >>> cell: 631 741 3358 <tel:%28631%29%20741-3358>
>     >>
>     >>> _______________________________________________
>     >>
>     >>> sPHENIX-HCal-l mailing list
>     >>
>     >>> sPHENIX-HCal-l AT lists.bnl.gov
>     <mailto:sPHENIX-HCal-l AT lists.bnl.gov>
>     <mailto:sPHENIX-HCal-l AT lists.bnl.gov
>     <mailto:sPHENIX-HCal-l AT lists.bnl.gov>>
>     >>
>     >>> https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
>     >>
>     >>
>     >>
>     >> _______________________________________________
>     >> sPHENIX-HCal-l mailing list
>     >> sPHENIX-HCal-l AT lists.bnl.gov <mailto:sPHENIX-HCal-l AT lists.bnl.gov>
>     >> https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
>     >>
>     >
>     >
>     > --
>     > Martin L. Purschke, Ph.D.        ;   purschke AT bnl.gov
>     <mailto:purschke AT bnl.gov>
>     >                                 ;
>      http://www.phenix.bnl.gov/~purschke
>     <http://www.phenix.bnl.gov/%7Epurschke>
>     >                                 ;
>     > Brookhaven National Laboratory   ;   phone: +1-631-344-5244
>     <tel:%28631%29%20344-5244>
>     > Physics Department Bldg 510 C    ;   fax:   +1-631-344-3253
>     <tel:%28631%29%20344-3253>
>     > Upton, NY 11973-5000             ;   skype: mpurschke
>     >
>     -----------------------------------------------------------------------
>     > _______________________________________________
>     > sPHENIX-HCal-l mailing list
>     > sPHENIX-HCal-l AT lists.bnl.gov <mailto:sPHENIX-HCal-l AT lists.bnl.gov>
>     > https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
>     _______________________________________________
>     sPHENIX-HCal-l mailing list
>     sPHENIX-HCal-l AT lists.bnl.gov <mailto:sPHENIX-HCal-l AT lists.bnl.gov>
>     https://lists.bnl.gov/mailman/listinfo/sphenix-hcal-l
>


--
Martin L. Purschke, Ph.D.        ;   purschke AT bnl.gov
                                 ;   http://www.phenix.bnl.gov/~purschke
                                 ;
Brookhaven National Laboratory   ;   phone: +1-631-344-5244
Physics Department Bldg 510 C    ;   fax:   +1-631-344-3253
Upton, NY 11973-5000             ;   skype: mpurschke
-----------------------------------------------------------------------



Archive powered by MHonArc 2.6.24.

Top of Page