star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
- From: Zhenyu Ye <yezhenyu2003 AT gmail.com>
- To: Gerard Visser <gvisser AT indiana.edu>
- Cc: star-fst-l AT lists.bnl.gov
- Subject: Re: [Star-fst-l] Weekly FST meeting - 10/31/2019
- Date: Sun, 10 Nov 2019 15:45:08 +0900
Gerard, thanks for looking into this.
> On Nov 7, 2019, at 11:48 PM, Gerard Visser <gvisser AT indiana.edu> wrote:
>
> hi Jianing,
> I checked the schematics
>
> outer hybrid
> https://drupal.star.bnl.gov/STAR/system/files/hybrid_outer_v2_3-schematic_0.pdf
>
> inner hybrid
> https://drupal.star.bnl.gov/STAR/system/files/hybrid_inner_v2_1-schematic.pdf
>
> T-board
> https://drupal.star.bnl.gov/STAR/system/files/T-Board_v3-schematic.pdf
>
> I think everything looks correct in these. One minor point is that we
> probably have to change the resistor values (on T-board and on hybrids) to
> have less reflection on the CLK and TRG lines. The cable has a
> characteristic impedance (differential) of around 100 to 110 Ohms. (It
> isn't very precisely controlled, we should measure it when we have the
> cable, but it will be around that value. So we should make the input
> impedance of T-board and hybrids assembly around 100-110 Ohms. I suggest
> changing the resistors R1, R2 on outer hybrid and on inner hybrid from 49.9
> to 78.7 Ohm,
Jianing, if the proposed changes are fine to you. can you please update the
hybrids schematics accordingly?
Yi, I understand that a company has assembled 6 inner hybrids w/o obvious
issue, but with the 49.9 Oh for R1/R2. Can they change them?
> and the leaving the resistors R9, R10, R11, R12 on the T-board at 33.2 Ohm.
> Final values have to be confirmed after all the boards and cable are
> available for a scope measurement. At that time we _might_ decide to change
> the value on T-board; the 78.7 Ohm on hybrids is very likely to be fine
> (and is of course a lot more trouble to modify on existing boards, so we
> won't want to do that).
> [FYI in IST from the documents at
> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-ist
> the naively calculated input impedance 166 Ohms which is not right. I am
> not sure why, perhaps the documents are not really all correct. I think Ben
> did look at CLK & TRG waveforms with a scope and optimize these, although I
> don't have any record of it.]
> I will have a look at new outer hybrid layout for electrical / layout
> issues only -- not for mechanical interface issues -- but I expect no
> problems, it will look nice as the prior version did.
Gerard, it will be great if you can look at the new outer hybrid layout for
electrical / layout issues asap, so that we can move forward with the new
hybrid production. This has now become the bottleneck of the project.
Best,
Zhenyu
> Thanks,
>
> Gerard
>
>
> On 10/31/2019 10:22 PM, 董家宁 wrote:
>> Hi Gerard,
>> Thanks for your help.
>> There are no changes on the connector part.
>> Please let me know if you need any other files.
>> Thanks!
>> Best,
>> Jianing
>>> -----原始邮件-----
>>> 发件人: "Gerard Visser" <gvisser AT indiana.edu>
>>> 发送时间: 2019-11-01 10:14:39 (星期五)
>>> 收件人: star-fst-l AT lists.bnl.gov
>>> 抄送:
>>> 主题: Re: [Star-fst-l] Weekly FST meeting - 10/31/2019
>>>
>>> hi Jianing, Zhenyu,
>>> Somebody was going to document (simply with a picture or two) how
>>> that the
>>> connector tab of outer (particularly) hybrid fits well to the T-board on
>>> mechanical structure. I think we should see this before the new outer
>>> hybrid is
>>> ordered. (Is there any change in this aspect of the new outer hybrid? I
>>> understood no change.)
>>> Meanwhile, yes it is in my inbox to check the electrical aspects, I
>>> will try to
>>> have that done by early next week.
>>> Thanks,
>>>
>>> Gerard
>>>
>>>
>>> On 10/31/2019 10:04 PM, 董家宁 wrote:
>>>> Dear All,
>>>>
>>>> 2.Hybrid, T-board:
>>>>
>>>> With the help of Mike and Gerard, the address connection for the
>>>> temperature
>>>> sensor chip on outer hybrid is modified and updated.
>>>>
>>>> And the schematic for T-board v3.0 is also updated (keep one set of
>>>> temperature sensor and reset circuit).
>>>>
>>>> I think they are all waiting for the double check.
>>>>
>>>> If there are no other mistakes for outer hybrid layout, it will take
>>>> about 3
>>>> weeks for the production.
>>>>
>>>> All the detailed status are listed on the WIKI
>>>> (https://wiki.bnl.gov/star/index.php/Hybrid_and_T-board).
>>>>
>>>>
>>>> Best,
>>>>
>>>> Jianing
>>>>
>>>>
>>>> -----原始邮件-----
>>>> *发件人:*"Capotosto, Michael" <capotosto AT bnl.gov>
>>>> *发送时间:*2019-11-01 05:43:15 (星期五)
>>>> *收件人:* "Ye, Zhenyu" <yezhenyu AT uic.edu>, "star-fst-l AT lists.bnl.gov"
>>>> <star-fst-l AT lists.bnl.gov>
>>>> *抄送:*
>>>> *主题:* Re: [Star-fst-l] Weekly FST meeting - 10/31/2019
>>>>
>>>> All,
>>>>
>>>> As discussed last meeting, I’ve compiled the documentation and
>>>> posted it to
>>>> the wiki: https://wiki.bnl.gov/star/index.php/Cables
>>>>
>>>> T-Board/Inner Signal Cable:
>>>>
>>>> Last meeting we agreed we would use the IST-type of cables, due to
>>>> cost. It
>>>> turns out I misinterpreted the quote – we were quoted for 400ft of
>>>> cable but
>>>> they had a minimum 1,000ft order. It is cheaper as Gerard expected
>>>> to use
>>>> the Polypropylene/PVC/PVC cable. I’m waiting to hear back from
>>>> Gerard on how
>>>> he’d like to proceed. The updated quotes binder mentioned can be
>>>> found here:
>>>>
>>>> https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf
>>>>
>>>> <https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf>
>>>> The quotes binder also includes new updated (non-expired) quotes, so
>>>> once we
>>>> have a decision we can order the cables. (Elke/Gerard/Zhenyu, will
>>>> this be
>>>> on one of the BNL accounts, or will I be sending this to someone
>>>> else? If it
>>>> will be on a BNL account I can start drafting the PO so it will be
>>>> ready to
>>>> send when we make a final decision).
>>>>
>>>> Regarding the V2.1 T-Board modifications, I believe we just need to
>>>> remove a
>>>> handful of parts to in order to make it work, I’ve discussed this in
>>>> an
>>>> email with Jianing and Gerard, and am waiting to hear back from
>>>> Gerard. I
>>>> will have the cables re-labeled tonight before I leave (to match the
>>>> VIA REF
>>>> DES used in V2.1 T-Boards we are assembling). Once Gerard gives me
>>>> the O.K.
>>>> I’ll pull the parts off the boards, and we should be able to give
>>>> them to
>>>> the assembler within a working day or two. If there are no
>>>> objections, I
>>>> will extend the due date for the vendor to November 29.
>>>>
>>>> If I’ve missed any points please let me know.
>>>>
>>>> Best,
>>>>
>>>> Mike Capotosto
>>> _______________________________________________
>>> Star-fst-l mailing list
>>> Star-fst-l AT lists.bnl.gov
>>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/07/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Zhenyu Ye, 11/10/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/31/2019, 董家宁, 11/10/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/14/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/14/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/31/2019, Zhenyu Ye, 11/14/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
董家宁, 11/15/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/25/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
董家宁, 11/26/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/31/2019, Gerard Visser, 11/26/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Ye, Zhenyu, 11/26/2019
- Re: [Star-fst-l] Weekly FST meeting - 10/31/2019, 董家宁, 11/26/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
董家宁, 11/26/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/25/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Gerard Visser, 11/14/2019
-
Re: [Star-fst-l] Weekly FST meeting - 10/31/2019,
Zhenyu Ye, 11/10/2019
Archive powered by MHonArc 2.6.24.