Gerard, thanks for looking into the hybrid layouts. Regarding the clearance
of the APV die pad, I spoke with the Fermilab technician and was told that it
is doable with some caution.

Zhenyu

Sent from my iPhone

> On Nov 14, 2019, at 10:43 AM, Gerard Visser <gvisser AT indiana.edu> wrote:
>
> hi Jianing, Zhenyu,
> Zhenyu had asked if the inner hybrid (2.1) looked similarly in my
> opinion. I had a look at that again just now. Of course the 4th point below
> is not applicable. As to APV die attach pad clearance, it is different on
> the inner hybrid and looks like on average anyway more clearance. I think
> it could still have had a bit more clearance though. (But, doing an angled
> layout can be difficult, increasing clearance may be difficult. And anyway
> the real question is what do the bonding experts who will be assembling
> this think? If they say it is fine to assemble without risk of shorts then
> that is completely fine, no more clearance is needed than that.) The
> temperature sensor is closer to APV by default since everything is closer
> together. The skinny power layout issues are there but not as severely; I
> see again one via carrying power where I'd prefer to have seen a couple of
> vias in parallel.
> In summary I don't see any catastrophic issues there. It makes sense to
> improve the new outer hybrid, assemble a full module and read it out and
> see good pedestals and cosmics and then declare victory and move on to
> production. But if for any reason the inner is revised these points should
> be addressed then.
> Sincerely,
>
> Gerard
>
>
>> On 11/14/2019 9:53 AM, Gerard Visser wrote:
>> hi Jianing,
>> The outer hybrid layout looks pretty good, but I have a few comments
>> for your consideration:
>> - I have some concerns about impedance of power routing on the hybrid,
>> please see attached picture. Unless I am misunderstanding something, it is
>> not too good and it could I think be very much improved with small changes
>> in your layout. It is very hard to say how important this is. However I
>> think the APV chip is not the best in the world for insensitivity to power
>> supply voltage and noise; statement based on my recollections of
>> prototyping for the STAR FGT. I think we should take care to make it as
>> good as we reasonably can.
>> - It would be better if the temperature sensor was closer to one of the
>> middle APV chips. Those will of course be the hot spots. But this is not
>> critical, we don't really need an absolute temperature measurement from
>> these, really we just need to monitor if temperatures are changing from
>> whatever the normal reading turns out to be.
>> - I think it would be better if there was a lot more clearance around the
>> APV die attach pad to other nets. You have 0.212 mm. This is surely plenty
>> for building the hybrid, but I am worried about the die attach epoxy
>> spilling out and risking a short. Have the Fermilab people reviewed the
>> hybrid gerbers, any comment from them about it? I guess if they are not
>> worried, I am not worried about it then either, as long as they saw this
>> detail.
>> - Do we really want that long skinny bit of top coverlayer between the two
>> sensors? (I am assuming the .GTS gerber is negative of the coverlayer.)
>> Note I do not see this in the old (7/12/2019) hybrid in the picture that
>> Yi recently sent. Maybe it was there in design and your vendor deleted it
>> for you?
>> Sincerely,
>> Gerard
>>> On 11/7/2019 9:48 AM, Gerard Visser wrote:
>>> hi Jianing,
>>> I checked the schematics
>>>
>>> outer hybrid
>>> https://drupal.star.bnl.gov/STAR/system/files/hybrid_outer_v2_3-schematic_0.pdf
>>>
>>> inner hybrid
>>> https://drupal.star.bnl.gov/STAR/system/files/hybrid_inner_v2_1-schematic.pdf
>>>
>>> T-board
>>> https://drupal.star.bnl.gov/STAR/system/files/T-Board_v3-schematic.pdf
>>>
>>> I think everything looks correct in these. One minor point is that
>>> we probably have to change the resistor values (on T-board and on
>>> hybrids) to have less reflection on the CLK and TRG lines. The cable has
>>> a characteristic impedance (differential) of around 100 to 110 Ohms. (It
>>> isn't very precisely controlled, we should measure it when we have the
>>> cable, but it will be around that value. So we should make the input
>>> impedance of T-board and hybrids assembly around 100-110 Ohms. I suggest
>>> changing the resistors R1, R2 on outer hybrid and on inner hybrid from
>>> 49.9 to 78.7 Ohm, and the leaving the resistors R9, R10, R11, R12 on the
>>> T-board at 33.2 Ohm. Final values have to be confirmed after all the
>>> boards and cable are available for a scope measurement. At that time we
>>> _might_ decide to change the value on T-board; the 78.7 Ohm on hybrids is
>>> very likely to be fine (and is of course a lot more trouble to modify on
>>> existing boards, so we won't want to do that).
>>> [FYI in IST from the documents at
>>> https://drupal.star.bnl.gov/STAR/blog/yezhenyu/forward-silicon-tracker-ist
>>> the naively calculated input impedance 166 Ohms which is not right. I am
>>> not sure why, perhaps the documents are not really all correct. I think
>>> Ben did look at CLK & TRG waveforms with a scope and optimize these,
>>> although I don't have any record of it.]
>>> I will have a look at new outer hybrid layout for electrical /
>>> layout issues only -- not for mechanical interface issues -- but I expect
>>> no problems, it will look nice as the prior version did.
>>> Thanks,
>>>
>>> Gerard
>>>
>>>
>>>> On 10/31/2019 10:22 PM, 董家宁 wrote:
>>>> Hi Gerard,
>>>> Thanks for your help.
>>>> There are no changes on the connector part.
>>>> Please let me know if you need any other files.
>>>> Thanks!
>>>>
>>>> Best,
>>>> Jianing
>>>>
>>>>
>>>>> -----原始邮件-----
>>>>> 发件人: "Gerard Visser" <gvisser AT indiana.edu>
>>>>> 发送时间: 2019-11-01 10:14:39 (星期五)
>>>>> 收件人: star-fst-l AT lists.bnl.gov
>>>>> 抄送:
>>>>> 主题: Re: [Star-fst-l] Weekly FST meeting - 10/31/2019
>>>>>
>>>>> hi Jianing, Zhenyu,
>>>>> Somebody was going to document (simply with a picture or two) how
>>>>> that the
>>>>> connector tab of outer (particularly) hybrid fits well to the T-board on
>>>>> mechanical structure. I think we should see this before the new outer
>>>>> hybrid is
>>>>> ordered. (Is there any change in this aspect of the new outer hybrid? I
>>>>> understood no change.)
>>>>> Meanwhile, yes it is in my inbox to check the electrical aspects, I
>>>>> will try to
>>>>> have that done by early next week.
>>>>> Thanks,
>>>>>
>>>>> Gerard
>>>>>
>>>>>
>>>>>> On 10/31/2019 10:04 PM, 董家宁 wrote:
>>>>>> Dear All,
>>>>>>
>>>>>> 2.Hybrid, T-board:
>>>>>>
>>>>>> With the help of Mike and Gerard, the address connection for the
>>>>>> temperature
>>>>>> sensor chip on outer hybrid is modified and updated.
>>>>>>
>>>>>> And the schematic for T-board v3.0 is also updated (keep one set of
>>>>>> temperature sensor and reset circuit).
>>>>>>
>>>>>> I think they are all waiting for the double check.
>>>>>>
>>>>>> If there are no other mistakes for outer hybrid layout, it will
>>>>>> take about 3
>>>>>> weeks for the production.
>>>>>>
>>>>>> All the detailed status are listed on the WIKI
>>>>>> (https://wiki.bnl.gov/star/index.php/Hybrid_and_T-board).
>>>>>>
>>>>>>
>>>>>> Best,
>>>>>>
>>>>>> Jianing
>>>>>>
>>>>>>
>>>>>> -----原始邮件-----
>>>>>> *发件人:*"Capotosto, Michael" <capotosto AT bnl.gov>
>>>>>> *发送时间:*2019-11-01 05:43:15 (星期五)
>>>>>> *收件人:* "Ye, Zhenyu" <yezhenyu AT uic.edu>, "star-fst-l AT lists.bnl.gov"
>>>>>> <star-fst-l AT lists.bnl.gov>
>>>>>> *抄送:*
>>>>>> *主题:* Re: [Star-fst-l] Weekly FST meeting - 10/31/2019
>>>>>>
>>>>>> All,
>>>>>>
>>>>>> As discussed last meeting, I’ve compiled the documentation and
>>>>>> posted it to
>>>>>> the wiki: https://wiki.bnl.gov/star/index.php/Cables
>>>>>>
>>>>>> T-Board/Inner Signal Cable:
>>>>>>
>>>>>> Last meeting we agreed we would use the IST-type of cables, due
>>>>>> to cost. It
>>>>>> turns out I misinterpreted the quote – we were quoted for 400ft
>>>>>> of cable but
>>>>>> they had a minimum 1,000ft order. It is cheaper as Gerard
>>>>>> expected to use
>>>>>> the Polypropylene/PVC/PVC cable. I’m waiting to hear back from
>>>>>> Gerard on how
>>>>>> he’d like to proceed. The updated quotes binder mentioned can be
>>>>>> found here:
>>>>>> https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf
>>>>>>
>>>>>> <https://drupal.star.bnl.gov/STAR/system/files/Cable%20Quotes%20Binder%2010-28-2019.pdf>
>>>>>>
>>>>>> The quotes binder also includes new updated (non-expired) quotes,
>>>>>> so once we
>>>>>> have a decision we can order the cables. (Elke/Gerard/Zhenyu,
>>>>>> will this be
>>>>>> on one of the BNL accounts, or will I be sending this to someone
>>>>>> else? If it
>>>>>> will be on a BNL account I can start drafting the PO so it will
>>>>>> be ready to
>>>>>> send when we make a final decision).
>>>>>>
>>>>>> Regarding the V2.1 T-Board modifications, I believe we just need
>>>>>> to remove a
>>>>>> handful of parts to in order to make it work, I’ve discussed this
>>>>>> in an
>>>>>> email with Jianing and Gerard, and am waiting to hear back from
>>>>>> Gerard. I
>>>>>> will have the cables re-labeled tonight before I leave (to match
>>>>>> the VIA REF
>>>>>> DES used in V2.1 T-Boards we are assembling). Once Gerard gives
>>>>>> me the O.K.
>>>>>> I’ll pull the parts off the boards, and we should be able to give
>>>>>> them to
>>>>>> the assembler within a working day or two. If there are no
>>>>>> objections, I
>>>>>> will extend the due date for the vendor to November 29.
>>>>>>
>>>>>> If I’ve missed any points please let me know.
>>>>>>
>>>>>> Best,
>>>>>>
>>>>>> Mike Capotosto
>>>>> _______________________________________________
>>>>> Star-fst-l mailing list
>>>>> Star-fst-l AT lists.bnl.gov
>>>>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>> _______________________________________________
>> Star-fst-l mailing list
>> Star-fst-l AT lists.bnl.gov
>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l




Archive powered by MHonArc 2.6.24.

Top of Page