Hi Flemming.
> On Jul 30, 2020, at 8:58 AM, videbaek <videbaek AT bnl.gov> wrote:
>
>
> Hi Sun and Zhenyu
>
> thanks for the update -
> Looks overall good now.
> - Please take Gerads comment into account.
>
> I have a comment on on the slide 17;
>
> between some of the steps at FNAL you will check connectivity before going
> on to the next step as shown on
> slide 3. How does this add to the time estimate? Will you bring the modules
> back and forth to UIC?
The time for the module test (0.5 hour/module, shown on slide 8) should not
add to the total time, which is dominated by the overnight curing of each
gluing step. We plan to set up the test stand at FNAL, and so no back and
forth between FNAL/UIC for production.
> In total you have set aside 4 month for the assembly i.e. ~ 88 workdays so
> there is about
> 2 workdays available per module. Can you confirm.
Below is the initial statement from SiDet manager a few days ago. I am in the
process of discussing the technical details (setting up the test stand,
making a new assembly tooling set, etc)
> Yes, i think we can complete this work near your schedule if there are no
> snags or unforeseen circumstances. Please remember that lab projects have
> priority, but we haven’t had too many issues thus far except COVID. Rick
>
>> On Jul 27, 2020, at 6:22 PM, Ye, Zhenyu <yezhenyu AT uic.edu> wrote:
>>
>> Can you comment on the schedule, i.e., can Bert/Michelle/Gary complete the
>> production of 48 modules in March-June 2021?
>>
>> Best
>> Zhenyu
Zhenyu
>
>
>
> On 2020-07-30 00:08, Xu Sun wrote:
>> Hi Flemming,
>> Sorry for the late reply. Please find my updated slides in the
>> following link:
>> https://drupal.star.bnl.gov/STAR/system/files/FstReviewAug2020_v7.pdf
>> Comments and suggestions are welcome.
>> Best,
>> Xu
>> On Tue, Jul 28, 2020 at 1:55 PM videbaek <videbaek AT bnl.gov> wrote:
>>> Hi
>>> Here are some comments to what should be in the talk: Rahul, Sun,
>>> Maowu
>>> the comments are also in word document
>>> best
>>> Flemming
>>> Assembly UIC/FNAL
>>> There has to be a slide on the Q&A done during production as we talk
>>> about on Monday
>>> // slide 11
>>> Test to be performed –
>>> Amount on time –
>>> Tracking of outcome (how recorded)
>>> Check of temperature of APV chips with infrared sensor/camera. With
>>> cooled water
>>> Maybe done at UIC or at BNL -TDB
>>> Mentioned that this will be repeated when they arrive/assembled in
>>> at
>>> BNL
>>> Need a slide that details just in words the step for assembly
>>> You can keep the summary,
>>> But on slide before take the assembly tasks – put into a 3 column
>>> table
>>> with col 2 == time
>>> (days () , -- also is there no steps for curing time and column 3
>>> with
>>> institution/man power
>>> Repeat the number of assemblies to make; what can be done in
>>> parallel
>>> This is important information to evaluate the 3 months
>>> --
>>> Add an ESH slide describing the additional materials used in
>>> assembly
>>> (like glue, epoxy for encapsulation)
>>> Add statement that you follow UIC guidelines for working safely in
>>> the
>>> lab.
>>> Hybrid & T-boards
>>> Slide 5 ; reformulate the waiting for .. as we discussed.
>>> I assume we agreed we would not change mechanics for the T-board,
>>> but
>>> move the capacitor on the board. Add a week for that task, (design +
>>> signoff by group)
>>> You got my estimate for connectors-
>>> I suggest the make production slide into two
>>> One for hybrid and one for T-board – you might indicator vendor
>>> –
>>> Based on experience with prototype.
>>> Give the quantities being made
>>> One slide with ES&H
>>> Materials proper (is there a standard that is being followed
>>> --- non flammable PCB ?
>>> Work at lab at SDU minimal. Follows University work rules.
>>> Integration
>>> Rahul
>>> Please add a slide on ES&H
>>> That we follow BNL rules
>>> There will be safety review (before actual production?)
>>> Certainly, one before installation
>>> Any specific concern that you pay attention to on this
>>> Also if you can add a slide where you discuss your response to
>>> Charge
>>> questions?
>>> (Those relevant like installation schedule)
>>> --
>>> Flemming Videbaek
>>> senior scientist
>>> videbaek @ bnl.gov [1]
>>> Brookhaven National Lab
>>> Physics Department
>>> Bldg 510D
>>> Upton, NY 11973
>>> phone: 631-344-4106
>>> cell :
>>> 631-681-1596_______________________________________________
>>> Star-fst-l mailing list
>>> Star-fst-l AT lists.bnl.gov
>>> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>> Links:
>> ------
>> [1] http://bnl.gov
>
> --
> Flemming Videbaek
> senior scientist
> videbaek @ bnl.gov
> Brookhaven National Lab
> Physics Department
> Bldg 510D
> Upton, NY 11973
>
> phone: 631-344-4106
> cell : 631-681-1596
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] comments to some of the talks,
videbaek, 07/28/2020
-
Re: [Star-fst-l] comments to some of the talks,
Yi Yang, 07/29/2020
-
Re: [Star-fst-l] comments to some of the talks,
Zhenyu Ye, 07/29/2020
- Re: [Star-fst-l] comments to some of the talks, videbaek, 07/29/2020
-
Re: [Star-fst-l] comments to some of the talks,
Zhenyu Ye, 07/29/2020
-
Re: [Star-fst-l] comments to some of the talks,
Xu Sun, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Gerard Visser, 07/30/2020
- Re: [Star-fst-l] comments to some of the talks, Xu Sun, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
videbaek, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Ye, Zhenyu, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
videbaek, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Yi Yang, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Ye, Zhenyu, 07/30/2020
- Re: [Star-fst-l] comments to some of the talks, Yi Yang, 07/31/2020
- Re: [Star-fst-l] comments to some of the talks, Ye, Zhenyu, 07/31/2020
- Re: [Star-fst-l] comments to some of the talks, Gerard Visser, 07/31/2020
- Re: [Star-fst-l] comments to some of the talks, Gerard Visser, 07/31/2020
- Re: [Star-fst-l] comments to some of the talks, videbaek, 07/31/2020
- Re: [Star-fst-l] comments to some of the talks, Yi Yang, 07/31/2020
-
Re: [Star-fst-l] comments to some of the talks,
Ye, Zhenyu, 07/30/2020
- Re: [Star-fst-l] comments to some of the talks, Yi Yang, 07/31/2020
-
Re: [Star-fst-l] comments to some of the talks,
Yi Yang, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
videbaek, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Ye, Zhenyu, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Gerard Visser, 07/30/2020
-
Re: [Star-fst-l] comments to some of the talks,
Yi Yang, 07/29/2020
Archive powered by MHonArc 2.6.24.