star-fst-l AT lists.bnl.gov
Subject: Star-fst-l mailing list
List archive
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time)
- From: Yi Yang <yiyang AT ncku.edu.tw>
- To: Gerard Visser <gvisser AT indiana.edu>
- Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time)
- Date: Wed, 12 Aug 2020 20:59:53 +0800
Hi Gerard,
Ahh... sorry, I forgot to reply this point.
Actually I don't think we will use those loose nuts for the final assembly.
I totally agree with you that it is extremely dangerous to use them. I dropped them on the chip and sensor areas many times while mounting the T-board on.
We didn't decide how to mount them yet, so any suggestions are very welcome.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web: http://phys.ncku.edu.tw/~yiyang
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, Aug 12, 2020 at 8:55 PM Gerard Visser <gvisser AT indiana.edu> wrote:
hi Yi,
Please think about if there is any reasonable alternative to using those small
loose nuts. Dropping them inside the magnet would be a risk for STAR.
Thanks,
Gerard
On 8/12/2020 8:50 AM, Yi Yang wrote:
> Hi Gerard,
>
> Not a program at all, it is good that we are on the same page. :-)
>
> Cheers,
> Yi
>
>
>
>
> +++++++++++++++++++++++++++++++++++++++++++++++++++
> Yi Yang, Associate Professor
> Department of Physics
> National Cheng Kung University
> Tainan, 701 Taiwan
> E-Mail: yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>
> Tel: +886-6-2757575 ext.65237
> Fax: +886-6-2747995
> Group Web: http://phys.ncku.edu.tw/~yiyang
> +++++++++++++++++++++++++++++++++++++++++++++++++++
>
>
> On Wed, Aug 12, 2020 at 2:07 AM Gerard Visser <gvisser AT indiana.edu
> <mailto:gvisser AT indiana.edu>> wrote:
>
> hi Yi,
> I apologize I was confused on that first point, I didn't remember
> that there
> were capacitors on both sides of the T-board, which is clear from a look at the
> gerber files again. The plan for new version is then that all will be on the
> side facing away from mechanical structure, OK. Sorry.
>
> Gerard
>
>
> On 8/11/2020 8:16 AM, Gerard Visser wrote:
> > hi Yi,
> > I am consfused by the pictures since don't the big tantalum
> capacitors on
> > existing T-board face towards the mechanical structure? That was said to
> be the
> > problem, which is now being fixed. But it doesn't look like a problem in
> your
> > pictures???
> > Were you able to actually plug in the outer hybrid? It looks like
> you did.
> > Also as a small comment, will it really be good to use loose nuts
> for this
> > fastening? We should as much as possible avoid the risk of dropping small
> parts,
> > *especially* for an operation that might have to be performed with the
> FST in
> > STAR out on the insertion rails, above and around the TPC and BEMC
> electronics
> > boards which are all exposed there. I had though there would be
> press-nuts on
> > one side or the other. Maybe this is impossible, at least now, but we should
> > think about it.
> > Sincerely,
> >
> > Gerard
> >
> >
> > On 8/10/2020 11:33 PM, Yi Yang wrote:
> >> Hi all,
> >>
> >> We tried to mount the T-Board onto MS and it seems to be okay.
> >> But I think we should prepare some toolings for the installation.
> >> Please check some photos in the following link:
> >> T-Board_mounting.pdf
> >> <https://drupal.star.bnl.gov/STAR/system/files/T-Board_mounting.pdf>
> >>
> >> Cheers,
> >> Yi
> >>
> >>
> >> +++++++++++++++++++++++++++++++++++++++++++++++++++
> >> Yi Yang, Associate Professor
> >> Department of Physics
> >> National Cheng Kung University
> >> Tainan, 701 Taiwan
> >> E-Mail: yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>
> <mailto:yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>>
> >> Tel: +886-6-2757575 ext.65237
> >> Fax: +886-6-2747995
> >> Group Web:
> https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!SAQPx9Ri_U0LMsI-kJryuTi7kmQ5x9z2cuwXyVQr_mwgVrxl6XH6qVUc5nh1_agdRO6tNDw$
>
> >>
> <https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!RrBFMBGZeyx7A9EvAOYEtwDPoTzu6UesNtbcWnWCrk3Ntska06asz6ZScNS3e41dLZMtdaQ$>
>
> >>
> >> +++++++++++++++++++++++++++++++++++++++++++++++++++
> >>
> >>
> >> On Tue, Aug 11, 2020 at 1:25 AM Ye, Zhenyu <yezhenyu AT uic.edu
> <mailto:yezhenyu AT uic.edu>
> >> <mailto:yezhenyu AT uic.edu <mailto:yezhenyu AT uic.edu>>> wrote:
> >>
> >> Minutes:
> >>
> >> 1. Flemming showed a draft of committee recommendations. He will have a
> >> meeting with the committee this afternoon. Expect to have a final
> version
> >> soon.
> >>
> >> 2. Silicon sensors
> >> -> Zhenyu: requested for a new quote from Hamamatsu. Partial delivery of
> >> Silicon sensors is not possible.
> >>
> >> 3. Use thermal camera with cooling applied to the other side of the
> >> mechanical structure to check if there is air trapped between hybrid
> and MS
> >> -> Yi: trying it this week. Consider doing this in production
> >>
> >> 4. Update the T-board design
> >> -> Jianing will update the design this week
> >> 1) Move the capacitor to the other side
> >> 2) Add two ground holes
> >> 3) Tolerance for mounting T-board on the MS, taking into account the
> >> constraint from connecting the outer hybrid
> >> 4) Check mounting T-board on the MS -> Yi will do it at NCKU
> >>
> >> 5. Split HV for inner and outer
> >> -> Decided to split HV. Mike/Gerard will look into the changes to
> PPB and
> >> back-of-crate boards
> >>
> >> 6. Integration
> >> -> Rahul: will do a tolerance analysis, taking into account the
> >> clearance/project requirements but also what can be achieved by the
> machine
> >> shop. Need to have a plan for survey and discuss with Survey group
> >>
> >> 7. Simulation
> >> -> Gavin/Shenghui: slow simulator based on cosmic data is ready.
> Trying to
> >> run the tracking code on RCF.
> >>
> >> 8. Mechanical structure
> >> -> Yi: Han-Sheng leaving the project next week for PhD in US. Test
> the new
> >> procedure with old hybrids. Will verify with the vendor about
> changes to the
> >> precision pin: lead and pin lengths
> >>
> >> ***** Action items *****
> >> 1) Design and fabricate light-tight box for the DAQ integration test
> at BNL
> >> - Rahul/Flemming
> >> 2) Design the cooling lines, and cable trays between disks and cooling
> >> manifold - Felix/Rahul
> >> 3) Finalize how to mount modules onto the half-rings, and half-rings
> onto
> >> support structure, and document the proposed changes to the mechanical
> >> structure - Rahul/Yi/Zhenyu
> >> 4) Survey procedure/requirements - Rahul
> >>
> >> 5) Prepare documents for prelim Safety review with C-AD - all
> >> 6) Get updated quote from Hamamatsu - Zhenyu
> >> 7) Design and fabricate module storage boxes for production at UIC -
> >> Xu/Andres
> >> 8) Duplicate the module assembly tooling at UIC - Xu/Zhenyu
> >> 9) Discuss with Fermilab about module assembly schedule - Zhenyu
> >>
> >> 10) Update the T-board design to avoid the conflict with Mechanical
> >> structure - Jianing/Maowu
> >> 11) Check how T-board mount onto MS - Yi
> >>
> >> 12) Look into splitting the inner and outer sensor HV bias - Mike/Gerard
> >> 13) Send the problematic prototype cable-T-board assembly to Mike for
> >> investigation - Zhenyu/Mike
> >> 14) Develop the QC procedure for Inner cable and T-board assembly -
> >> Mike/Maowu
> >>
> >> 15) Look into the overall large CMN noise, and the abnormal noise of few
> >> channels first appear in the readout - Gerard/Xu
> >> 16) Check the FST noise performance at high readout rate - Xu/Zhenyu
> >> 17) Sett up the laser test stand to characterize prototype module
> >> performance - Andres/Zhenyu
> >> 18) FST slow simulator with efficiency/resolution measured with
> prototypes
> >> and study tracking performance - Gavin/Shenghui
> >>
> >> > On Aug 8, 2020, at 10:48 AM, Ye, Zhenyu <yezhenyu AT uic.edu
> <mailto:yezhenyu AT uic.edu>
> >> <mailto:yezhenyu AT uic.edu <mailto:yezhenyu AT uic.edu>>> wrote:
> >> >
> >> > Dear all,
> >> >
> >> > We will have the Weekly FST meeting on Monday starting at 9am EST
> (BNL
> >> local time).
> >> >
> >> > Bluejeans Meeting URL https://bluejeans.com/101020434
> >> > Meeting ID: 101 020 434
> >> >
> >> >
> >>
> >>
> https://drupal.star.bnl.gov/STAR/event/2020/08/10/star-forward-silicon-tracker-meeting
>
> >>
> >> >
> >> > 0. follow-ups on review and action items
> >> > 1. Integration by Rahul Sharma, Felix Archampong
> >> > 2. Hybrid and T-board
> by
> >> Maowu Nie, Jianing Dong
> >> > 3. Simulation Studies by Gavin Wilks, Shenghui Zhang, Daniel
> >> Brandenburg
> >> > 4. Prototype Module Assembly and Test by
> Zhenyu Ye
> >> > 5. Mechanical structure by Yi Yang
> >> > _______________________________________________
> >> > Star-fst-l mailing list
> >> > Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
> <mailto:Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>>
> >> > https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >>
> >> _______________________________________________
> >> Star-fst-l mailing list
> >> Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
> <mailto:Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>>
> >> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >>
> >>
> >> _______________________________________________
> >> Star-fst-l mailing list
> >> Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
> >> https://lists.bnl.gov/mailman/listinfo/star-fst-l
> >>
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
> https://lists.bnl.gov/mailman/listinfo/star-fst-l
>
-
[Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/08/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Yi Yang, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), videbaek, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
videbaek, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Capotosto, Michael, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Zhenyu Ye, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Capotosto, Michael, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
videbaek, 08/11/2020
Archive powered by MHonArc 2.6.24.