Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time)
- From: Gerard Visser <gvisser AT indiana.edu>
- To: videbaek <videbaek AT bnl.gov>, Yi Yang <yiyang AT ncku.edu.tw>
- Cc: Star-fst L <star-fst-l AT lists.bnl.gov>
- Subject: Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time)
- Date: Wed, 12 Aug 2020 13:20:50 -0400
Hi Flemming,
I think that that is certainly the right plan. But if later there is a problem developed and found just before (or after) insertion, I suppose we might want to try to fix it in situ rather than dismounting and taking back to the clean roon?
If the decision is that for any repair we remove the half to the clean room, then we don't have to worry about the risk to TPC/BEMC electronics in case any small part is dropped. I think we can work on it carefully in place if need be though, we did so for FGT. But we should try to avoid very small loose parts -- and anyway as Yi said they also pose a risk for the FST itself.
Gerard
On 8/12/2020 1:15 PM, videbaek wrote:
I would hope that all the cable mounting and dressing would be done on the half-structures in the clean room so the setup could be checked out there as the modules arrive. But in any case you want to make it as simple and safe as possible.
best F.
On 2020-08-12 08:59, Yi Yang wrote:
Hi Gerard,
Ahh... sorry, I forgot to reply this point.
Actually I don't think we will use those loose nuts for the final
assembly.
I totally agree with you that it is extremely dangerous to use them. I
dropped them on the chip and sensor areas many times while mounting
the T-board on.
We didn't decide how to mount them yet, so any suggestions are very
welcome.
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web:
https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!VAiPy1lSYNWxsoS_nLbQ9qCAiTsWdUyIUD-IXVA3-XPawTyUMi3wK2JvQp5lX7K4Nvt-UKQ$
[1]
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, Aug 12, 2020 at 8:55 PM Gerard Visser <gvisser AT indiana.edu>
wrote:
hi Yi,https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!SAQPx9Ri_U0LMsI-kJryuTi7kmQ5x9z2cuwXyVQr_mwgVrxl6XH6qVUc5nh1_agdRO6tNDw$
Please think about if there is any reasonable alternative to
using those small
loose nuts. Dropping them inside the magnet would be a risk for
STAR.
Thanks,
Gerard
On 8/12/2020 8:50 AM, Yi Yang wrote:
Hi Gerard,
Not a program at all, it is good that we are on the same page. :-)
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web:
https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!VAiPy1lSYNWxsoS_nLbQ9qCAiTsWdUyIUD-IXVA3-XPawTyUMi3wK2JvQp5lX7K4Nvt-UKQ$
[1]
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Wed, Aug 12, 2020 at 2:07 AM Gerard Visser <gvisser AT indiana.edu
<mailto:gvisser AT indiana.edu>> wrote:didn't remember
hi Yi,
I apologize I was confused on that first point, I
that therefrom a look at the
were capacitors on both sides of the T-board, which is clear
gerber files again. The plan for new version is then that allwill be on the
side facing away from mechanical structure, OK. Sorry.tantalum
Gerard
On 8/11/2020 8:16 AM, Gerard Visser wrote:
hi Yi,
I am consfused by the pictures since don't the big
capacitors onThat was said to
existing T-board face towards the mechanical structure?
be thea problem in
problem, which is now being fixed. But it doesn't look like
yourlooks like
pictures???
Were you able to actually plug in the outer hybrid? It
you did.loose nuts
Also as a small comment, will it really be good to use
for thisdropping small
fastening? We should as much as possible avoid the risk of
parts,performed with the
*especially* for an operation that might have to be
FST inand BEMC
STAR out on the insertion rails, above and around the TPC
electronicswould be
boards which are all exposed there. I had though there
press-nuts onnow, but we should
one side or the other. Maybe this is impossible, at least
okay.think about it.
Sincerely,
Gerard
On 8/10/2020 11:33 PM, Yi Yang wrote:
Hi all,
We tried to mount the T-Board onto MS and it seems to be
installation.But I think we should prepare some toolings for the
<https://drupal.star.bnl.gov/STAR/system/files/T-Board_mounting.pdf>Please check some photos in the following link:
T-Board_mounting.pdf
<mailto:yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>>
Cheers,
Yi
+++++++++++++++++++++++++++++++++++++++++++++++++++
Yi Yang, Associate Professor
Department of Physics
National Cheng Kung University
Tainan, 701 Taiwan
E-Mail: yiyang AT ncku.edu.tw <mailto:yiyang AT ncku.edu.tw>
Tel: +886-6-2757575 ext.65237
Fax: +886-6-2747995
Group Web:
<https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!RrBFMBGZeyx7A9EvAOYEtwDPoTzu6UesNtbcWnWCrk3Ntska06asz6ZScNS3e41dLZMtdaQ$>
https://drupal.star.bnl.gov/STAR/event/2020/08/10/star-forward-silicon-tracker-meeting<yezhenyu AT uic.edu
+++++++++++++++++++++++++++++++++++++++++++++++++++
On Tue, Aug 11, 2020 at 1:25 AM Ye, Zhenyu
<mailto:yezhenyu AT uic.edu>wrote:
<mailto:yezhenyu AT uic.edu <mailto:yezhenyu AT uic.edu>>>
recommendations. He will have a
Minutes:
1. Flemming showed a draft of committee
have a finalmeeting with the committee this afternoon. Expect to
versionPartial delivery of
soon.
2. Silicon sensors
-> Zhenyu: requested for a new quote from Hamamatsu.
other side of theSilicon sensors is not possible.
3. Use thermal camera with cooling applied to the
between hybridmechanical structure to check if there is air trapped
and MSproduction
-> Yi: trying it this week. Consider doing this in
into account the
4. Update the T-board design
-> Jianing will update the design this week
1) Move the capacitor to the other side
2) Add two ground holes
3) Tolerance for mounting T-board on the MS, taking
at NCKUconstraint from connecting the outer hybrid
4) Check mounting T-board on the MS -> Yi will do it
changes to
5. Split HV for inner and outer
-> Decided to split HV. Mike/Gerard will look into the
PPB andaccount the
back-of-crate boards
6. Integration
-> Rahul: will do a tolerance analysis, taking into
achieved by theclearance/project requirements but also what can be
machineSurvey group
shop. Need to have a plan for survey and discuss with
is ready.
7. Simulation
-> Gavin/Shenghui: slow simulator based on cosmic data
Trying toPhD in US. Test
run the tracking code on RCF.
8. Mechanical structure
-> Yi: Han-Sheng leaving the project next week for
the newvendor about
procedure with old hybrids. Will verify with the
changes to theintegration test
precision pin: lead and pin lengths
***** Action items *****
1) Design and fabricate light-tight box for the DAQ
at BNLdisks and cooling
- Rahul/Flemming
2) Design the cooling lines, and cable trays between
and half-ringsmanifold - Felix/Rahul
3) Finalize how to mount modules onto the half-rings,
ontoto the mechanical
support structure, and document the proposed changes
C-AD - allstructure - Rahul/Yi/Zhenyu
4) Survey procedure/requirements - Rahul
5) Prepare documents for prelim Safety review with
production at UIC -6) Get updated quote from Hamamatsu - Zhenyu
7) Design and fabricate module storage boxes for
Xu/ZhenyuXu/Andres
8) Duplicate the module assembly tooling at UIC -
schedule - Zhenyu9) Discuss with Fermilab about module assembly
with Mechanical
10) Update the T-board design to avoid the conflict
bias - Mike/Gerardstructure - Jianing/Maowu
11) Check how T-board mount onto MS - Yi
12) Look into splitting the inner and outer sensor HV
assembly to Mike for13) Send the problematic prototype cable-T-board
T-board assembly -investigation - Zhenyu/Mike
14) Develop the QC procedure for Inner cable and
abnormal noise of fewMike/Maowu
15) Look into the overall large CMN noise, and the
rate - Xu/Zhenyuchannels first appear in the readout - Gerard/Xu
16) Check the FST noise performance at high readout
prototype module17) Sett up the laser test stand to characterize
measured withperformance - Andres/Zhenyu
18) FST slow simulator with efficiency/resolution
prototypes<yezhenyu AT uic.edu
and study tracking performance - Gavin/Shenghui
> On Aug 8, 2020, at 10:48 AM, Ye, Zhenyu
<mailto:yezhenyu AT uic.edu>wrote:
<mailto:yezhenyu AT uic.edu <mailto:yezhenyu AT uic.edu>>>
starting at 9am EST>
> Dear all,
>
> We will have the Weekly FST meeting on Monday
(BNLhttps://bluejeans.com/101020434
local time).
>
> Bluejeans Meeting URL
> Meeting ID: 101 020 434
>
>
Felix Archampong
>
> 0. follow-ups on review and action items
> 1. Integration by Rahul Sharma,
> 2. Hybrid and T-board
byZhang, Daniel
Maowu Nie, Jianing Dong
> 3. Simulation Studies by Gavin Wilks, Shenghui
byBrandenburg
> 4. Prototype Module Assembly and Test
Zhenyu Ye<mailto:Star-fst-l AT lists.bnl.gov>
> 5. Mechanical structure by Yi Yang
> _______________________________________________
> Star-fst-l mailing list
> Star-fst-l AT lists.bnl.gov
<mailto:Star-fst-l AT lists.bnl.gov<mailto:Star-fst-l AT lists.bnl.gov>>
<mailto:Star-fst-l AT lists.bnl.gov>><mailto:Star-fst-l AT lists.bnl.gov> https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
_______________________________________________https://lists.bnl.gov/mailman/listinfo/star-fst-l
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-fst-l
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov <mailto:Star-fst-l AT lists.bnl.gov>
https://lists.bnl.gov/mailman/listinfo/star-fst-l
Links:
------
[1] https://urldefense.com/v3/__http://phys.ncku.edu.tw/*yiyang__;fg!!P4SdNyxKAPE!U_s2wRz98zncWIZ2zDyG_w-tIj9DPtDq20q3vBKHDp21T2HOCMAlmEvOEtJxeMSerjJmz0A$
_______________________________________________
Star-fst-l mailing list
Star-fst-l AT lists.bnl.gov
https://lists.bnl.gov/mailman/listinfo/star-fst-l
-
[Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/08/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Yi Yang, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), videbaek, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Yi Yang, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Ye, Zhenyu, 08/10/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
videbaek, 08/11/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Capotosto, Michael, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
- Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time), Zhenyu Ye, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),
Gerard Visser, 08/12/2020
-
Re: [Star-fst-l] Weekly FST meeting, August 10 9am (BNL time),