Skip to Content.
Sympa Menu

usatlas-hllhc-l2deputymgmt-nsf-l - Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] March 1-2 Director’s Review Homework Questions

usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov

Subject: U.S. ATLAS HL-LHC Upgrade Level 2 and Deputies-NSF only Management Mailing List

List archive

Chronological Thread  
  • From: Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu>
  • To: John Parsons <parsons AT nevis.columbia.edu>
  • Cc: Michael Tuts <tuts AT pmtuts.net>, "us-atlas-hllhc-pmgmt-l AT lists.bnl.gov" <us-atlas-hllhc-pmgmt-l AT lists.bnl.gov>, "usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov" <usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
  • Subject: Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] March 1-2 Director’s Review Homework Questions
  • Date: Wed, 1 Mar 2023 21:04:01 -0500


Sure, that’s easy enough.

> On Mar 1, 2023, at 8:59 PM, John Parsons <parsons AT nevis.columbia.edu> wrote:
>
>
> I would still suggest an asterisk that says something like "Very close but
> not identical to cost at MREFC start on 4/1/2020."
>
> On 3/1/23 8:55 PM, Gustaaf Brooijmans wrote:
>> It’s in the table!
>>> On Mar 1, 2023, at 8:52 PM, John Parsons <parsons AT nevis.columbia.edu>
>>> wrote:
>>>
>>>
>>> OK, that is fine, but it should be made very clear since otherwise the
>>> "answer" will only generate more questions.
>>>
>>> On 3/1/23 8:49 PM, Gustaaf Brooijmans wrote:
>>>> Of course. These are not the baseline numbers. The request is to put
>>>> “original” base and contingency calculation next to “current”. We have
>>>> no contingency simulation for the baseline numbers.
>>>>> On Mar 1, 2023, at 8:46 PM, John Parsons <parsons AT nevis.columbia.edu>
>>>>> wrote:
>>>>>
>>>>>
>>>>> Same for LAr. I showed in my L2 talk a baseline cost of 19.22M, which
>>>>> includes up to BCP 1027.
>>>>>
>>>>> John
>>>>>
>>>>> On 3/1/23 8:00 PM, Thomas Schwarz wrote:
>>>>>> For the table in q3, the numbers you have as original are the "FDR"
>>>>>> numbers, not the baseline. Is that what you want? There will be some
>>>>>> consistency issues - at least for muons. Our baseline starts at BCP
>>>>>> 1028.
>>>>>> Tom
>>>>>> ===================
>>>>>> Tom Schwarz
>>>>>> Associate Professor
>>>>>> Department of Physics
>>>>>> University of Michigan
>>>>>> Office: 734-764-8941
>>>>>> Lab: 734-763-7805
>>>>>> schwarzt AT umich.edu <mailto:schwarzt AT umich.edu>
>>>>>> ===================
>>>>>> On Wed, Mar 1, 2023 at 1:57 PM Gustaaf Brooijmans
>>>>>> <gusbroo AT nevis.columbia.edu <mailto:gusbroo AT nevis.columbia.edu>> wrote:
>>>>>> Hi,
>>>>>> I set up a google sheets doc so everybody can edit:
>>>>>>
>>>>>> https://urldefense.com/v3/__https://docs.google.com/presentation/d/1pc9McRumCppvOabd6qAar9a6aF741cOPTeVNOuYmd6M/edit?usp=sharing__;!!P4SdNyxKAPE!AWuJuPEL1-in8VMJzA2DlEFkVS31YK5-cQOZkPbEFVtfFwPozbP_hod5TNCTDE4VKZOr9OuZvXeUgbgepy9JVlzrmzEW4PCu5egQg6JxZTTuJR37HMlU1w$
>>>>>>
>>>>>> <https://urldefense.com/v3/__https://docs.google.com/presentation/d/1pc9McRumCppvOabd6qAar9a6aF741cOPTeVNOuYmd6M/edit?usp=sharing__;!!P4SdNyxKAPE!BC6GdmUO_ZA84FfAZ2T2DDE33hHpPT5YDqKUjWMGEgUDEVsFkqVS-xTHgGnKeBk5Obxe0Plc9kAB5Cad9xgmdhTZM4UCLP-YzcTKhQJrpijN-YM5RDy5_g$>
>>>>>> I have answered question 3. I think Penka was going to work on #1
>>>>>> after Alexei asked his question. #2 is for Chris and I think
>>>>>> between you and Hal you should be able to answer #4. Hal has slides
>>>>>> on this from the FDR.
>>>>>> Best,
>>>>>> Gustaaf
>>>>>>> On Mar 1, 2023, at 6:40 PM, Michael Tuts <tuts AT pmtuts.net
>>>>>>> <mailto:tuts AT pmtuts.net>> wrote:
>>>>>>>
>>>>>>> Hi Gustaaf,____
>>>>>>>
>>>>>>> I can put together something on subaward management.____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Do you have the original breakdown for 3? I have that based on the
>>>>>>> official breakdown as in our original award (I also put the
>>>>>>> breakdown for 1057 that I used in one of my slides), so could also
>>>>>>> do that if it helps.____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Maybe Hal could take what we get from the L2s and flesh out the
>>>>>>> last point on system engineering and interface management? I will
>>>>>>> make the subaward management slide.____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Can ask about the schedule distributions – one thought is that we
>>>>>>> posted Chris’ talk in the management breakout section … maybe they
>>>>>>> looked there and found something?____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Cheers, Mike____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> *From:* Gustaaf Brooijmans <gusbroo AT nevis.columbia.edu
>>>>>>> <mailto:gusbroo AT nevis.columbia.edu>>
>>>>>>> *Sent:* Wednesday, March 1, 2023 6:33 PM
>>>>>>> *To:* Michael Tuts <tuts AT pmtuts.net <mailto:tuts AT pmtuts.net>>;
>>>>>>> Meyer, Chris <cjmey AT iu.edu <mailto:cjmey AT iu.edu>>
>>>>>>> *Cc:* us-atlas-hllhc-pmgmt-l AT lists.bnl.gov
>>>>>>> <mailto:us-atlas-hllhc-pmgmt-l AT lists.bnl.gov>;
>>>>>>> usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
>>>>>>> <mailto:usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
>>>>>>> *Subject:* Re: [Usatlas-hllhc-l2deputymgmt-nsf-l] March 1-2
>>>>>>> Director’s Review Homework Questions____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Hi Mike,____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> I can produce the table for item #3 easily. I’m not sure what #2
>>>>>>> means - I don’t think we showed them graphs for MC schedule
>>>>>>> distributions, so maybe you can ask them what they mean by that?
>>>>>>> But I guess Chris can put a few of the PRA output graphs on a few
>>>>>>> slides?____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Best,____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Gustaaf____
>>>>>>>
>>>>>>>
>>>>>>>
>>>>>>> ____
>>>>>>>
>>>>>>> On Mar 1, 2023, at 6:28 PM, Michael Tuts <tuts AT pmtuts.net
>>>>>>> <mailto:tuts AT pmtuts.net>> wrote:____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>>> Hi All,____
>>>>>>>
>>>>>>> Attached are the homework questions. Most are addressed to the
>>>>>>> PO it looks like. The one area where L2s can contribute is
>>>>>>> part of the last one on system engineering practices and
>>>>>>> interface management – please put together some response for
>>>>>>> that.____
>>>>>>>
>>>>>>> ____
>>>>>>>
>>>>>>> Thanks, PO____
>>>>>>>
>>>>>>> ____
>>>>>>>
>>>>>>> *From:*LeCompte, Tom <lecompte AT slac.stanford.edu
>>>>>>> <mailto:lecompte AT slac.stanford.edu>>
>>>>>>> *Sent:*Wednesday, March 1, 2023 6:19 PM
>>>>>>> *To:*Michael Tuts <tuts AT nevis.columbia.edu
>>>>>>> <mailto:tuts AT nevis.columbia.edu>>
>>>>>>> *Cc:*Victor Krabbendam <VKrabbendam AT lsst.org
>>>>>>> <mailto:VKrabbendam AT lsst.org>>; Gutta, Rajendra Rao
>>>>>>> <rgutta AT bnl.gov <mailto:rgutta AT bnl.gov>>; Marco Verzocchi
>>>>>>> (marco.verzocchi AT gmail.com <mailto:marco.verzocchi AT gmail.com>)
>>>>>>> <marco.verzocchi AT gmail.com
>>>>>>> <mailto:marco.verzocchi AT gmail.com>>; Sarah Eno <eno AT umd.edu
>>>>>>> <mailto:eno AT umd.edu>>; Ted Liu (thliu AT fnal.gov
>>>>>>> <mailto:thliu AT fnal.gov>) <thliu AT fnal.gov
>>>>>>> <mailto:thliu AT fnal.gov>>; Darin Acosta <dea6 AT rice.edu
>>>>>>> <mailto:dea6 AT rice.edu>>; Alexei N. Safonov <safonov AT tamu.edu
>>>>>>> <mailto:safonov AT tamu.edu>>; Denisov, Dmitri <denisovd AT bnl.gov
>>>>>>> <mailto:denisovd AT bnl.gov>>
>>>>>>> *Subject:*March 1-2 Director’s Review Homework Questions____
>>>>>>>
>>>>>>> ____
>>>>>>>
>>>>>>> Hi Mike-____
>>>>>>>
>>>>>>> We have just a handful of questions:____
>>>>>>>
>>>>>>> * We would like to see a high-level (say Levels 1 and 2)
>>>>>>> milestone-based comparison ofthe original and revised
>>>>>>> schedules.____
>>>>>>> * We saw graphs of the schedule distributions from Monte
>>>>>>> Carlo runs; we would like to see similar graphs for
>>>>>>> cost____
>>>>>>> * We would like to see a table with four columns - original
>>>>>>> base and contingency and revised base and contingency.
>>>>>>> Rows should be at the the L2 level of detail.____
>>>>>>> * Please prepare a few slides to address Question K, "Is____
>>>>>>> * the project adhering to best practices in systems
>>>>>>> engineering, interface management, and subaward
>>>>>>> management?:____
>>>>>>>
>>>>>>> This should not sum up to more than a few slides.____
>>>>>>>
>>>>>>> The expectation is that Management, Cost & Schedule will not
>>>>>>> meet tomorrow, and instead people will join the various
>>>>>>> technical subcommittees. If this is a problem, let me know and
>>>>>>> we can adjust.____
>>>>>>>
>>>>>>> If you have questions, please email me or call at
>>>>>>> 331-803-0446.____
>>>>>>>
>>>>>>> Cheers,____
>>>>>>>
>>>>>>> Tom____
>>>>>>>
>>>>>>> _______________________________________________
>>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
>>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
>>>>>>> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
>>>>>>>
>>>>>>> https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
>>>>>>>
>>>>>>> <https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l>____
>>>>>>>
>>>>>>> __ __
>>>>>>>
>>>>>> _______________________________________________
>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
>>>>>> <mailto:Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov>
>>>>>>
>>>>>> https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
>>>>>>
>>>>>> <https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l>
>>>>>> _______________________________________________
>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l mailing list
>>>>>> Usatlas-hllhc-l2deputymgmt-nsf-l AT lists.bnl.gov
>>>>>> https://lists.bnl.gov/mailman/listinfo/usatlas-hllhc-l2deputymgmt-nsf-l
>>>>>
>>>>> --
>>>>> ______________________________________________________________________
>>>>>
>>>>> John Parsons
>>>>> Nevis Labs, Email: parsons AT nevis.columbia.edu
>>>>> Columbia University Phone: (914) 591-2820
>>>>> P.O. Box 137 Fax: (914) 591-8120
>>>>> Irvington, NY 10533 WWW:
>>>>> https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AWuJuPEL1-in8VMJzA2DlEFkVS31YK5-cQOZkPbEFVtfFwPozbP_hod5TNCTDE4VKZOr9OuZvXeUgbgepy9JVlzrmzEW4PCu5egQg6JxZTTuJR0b1Vcarw$
>>>>>
>>>>>
>>>>> ______________________________________________________________________
>>>>>
>>>
>>> --
>>> ______________________________________________________________________
>>>
>>> John Parsons
>>> Nevis Labs, Email: parsons AT nevis.columbia.edu
>>> Columbia University Phone: (914) 591-2820
>>> P.O. Box 137 Fax: (914) 591-8120
>>> Irvington, NY 10533 WWW:
>>> https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AWuJuPEL1-in8VMJzA2DlEFkVS31YK5-cQOZkPbEFVtfFwPozbP_hod5TNCTDE4VKZOr9OuZvXeUgbgepy9JVlzrmzEW4PCu5egQg6JxZTTuJR0b1Vcarw$
>>>
>>>
>>> ______________________________________________________________________
>>>
>
> --
> ______________________________________________________________________
>
> John Parsons
> Nevis Labs, Email: parsons AT nevis.columbia.edu
> Columbia University Phone: (914) 591-2820
> P.O. Box 137 Fax: (914) 591-8120
> Irvington, NY 10533 WWW:
> https://urldefense.com/v3/__http://www.nevis.columbia.edu/*parsons/__;fg!!P4SdNyxKAPE!AWuJuPEL1-in8VMJzA2DlEFkVS31YK5-cQOZkPbEFVtfFwPozbP_hod5TNCTDE4VKZOr9OuZvXeUgbgepy9JVlzrmzEW4PCu5egQg6JxZTTuJR0b1Vcarw$
>
>
> ______________________________________________________________________
>





Archive powered by MHonArc 2.6.24.

Top of Page